2009-3672009-367
Resolution Authorizing Change Order No.2 for Martz Field Tennis Court Rehabilitation Project
At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New
York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on November 23, 2009.
The meeting was called to order by Christopher Colsey, Supervisor, and upon roll being called,
the following were present:
PRESENT: Supervisor
Councilmembers
ABSENT:
Christopher J. Colsey
William H. Beale
Vincent F. Bettina
Maureen McCarthy
Joseph P. Paoloni
The following Resolution was introduced by Councilman Paoloni and seconded by
Councilwoman McCarthy.
WHEREAS, the Engineers to the Town, Morris Associates Engineering Consultants, PLLC,
have approved Change Order No. 2 to the Contract for the Martz Field Tennis Court Rehabilitation
Project, as per letter dated November 17, 2009.
NOW, THEREFORE, BE IT RESOLVED, as follows:
1. The recitations above set forth are incorporated in this Resolution as if fully set forth and
adopted herein.
2. The Town Board hereby approves Change Order No. 2 in the amount of Three Thousand,
Five Hundred Thirty -One Dollars and 00/100 ($3,531.00), dated November 17, 2009, for
the Martz Field Tennis Court Rehabilitation Project Contract between the Town of
Wappinger and Avello Brothers Paving Contractors, Inc., resulting in a new Contract sum in
the amount of One Hundred Ninety -One Thousand, Sixteen Dollars and 00/100
($191,016.00), for the reasons and associated costs set forth in the letter dated November,
2009, from Morris Associated Engineering Consultants, PLLC, a copy of which is affixed
hereto.
The foregoing was put to a vote which resulted as follows:
CHRISTOPHER COLSEY, SUPERVISOR
Voting: AYE
WILLIAM H. BEALE, COUNCILMAN
Voting: AYE
VINCENT F. BETTINA, COUNCILMAN
Voting: AYE
MAUREEN McCARTHY, COUNCILWOMAN
Voting: AYE
JOSEPH P. PAOLONI, COUNCILMAN
Voting: AYE
Dated: Wappingers Falls, New York
11/23/2009
The Resolution is hereby duly declared adopted.
laqiz:�
OHN C. MASTERSON, TOWN CLERK
yi
MORRIS ASSOCIATES
ENGINEERING CONSULTANTS, PLLC -
04
9 Elks Lane, Poughkeepsie, New York 12601 Tel: (845) 454-341.1 Fax: (845}473-1962
E] 187 Church Street, Poughkeepsie, New York 12601 Tel: (845) 471-7900 Fax: (845) 471-7901
❑ 389 Fairview Avenue, Hudson, New York 12534 Tel: (518) 82&2300 Fax: (518) 8283963
E -Mail: mordsassociates@aol.com.
November 17, 2009
Town of Wappinger Town Board
Town Hall
20 Middlebush Road
Wappingers Falls, NY 12590
Attn: Hon. Christopher Colsey, Supervisor
RE: Martz Field — Tennis Court Rehabilitation
Change Order #2
MA#W20840.00
Dear Mr. Colsey and Town Board Members:
Supervisor Office
NOV 17 2009
Received
Enclosed please find a copy of the AIA Document G701 entitled Change Order. The
purpose of this change order is a result of additional unsuitable material encountered during the
excavation approved in Change Order #1.
The amount of additional material removed was 66 tons of a cost increase of $3,531.00
($53.50/ton). The amount previously approved in Change Order #1 was for 460 tons at a cost
of $24,610.00. Therefore, the new total amount will be $28,141.00 for the placement of the sub-
base.
Please place this on the agenda for the November 23, 2009 Town Board Meeting for
approval of Change Order #2.
Please call me at -(914) 475-5749 (cell) or (845) 454-3411 Ext. 30 (office) to discuss this
matter prior to the meeting.
RJG/met
I... Enc.
John Masterson, Town Clerk
Very truly yours,
MORRIS ASSOCIATES
Engineering Consultants, PLLC
Fobert J. Gra ,
Engineer to the Town of Wappinger
E:\documents\TWappinger\aW2008\W20840 Martz Field\CO#2 Itr to TB 11-17-09.doc
VAIA
Document G701TM 2001
Change Order
PROJECT: (Name and address) CHANGE ORDER NUMBER: 2 OWNER ❑
���1•�/��✓ �����5 DATE: '/,� ARCHITECT 0
ARCHITECT'S PROJECT NUMBER: ', zleel 44
A' CONTRACTOR O
TO CONTRACTOR: (Name arxc address) FIELD ❑
CONTRACT DATE:14:74 1411 9 OTHER ❑
Ae
CONTRACT FOR:
•i
TheThe C�s changed as follows:
(Include., where applicable, any undisputed amount attributable to previously executed Construction Change /)irective.$),
C��fjov- 0�' v�1 0 rlr ��Q.�s.� �v3 5� Iasi =.'N'S,C; /F ZV
The original (Contract Sum) ( } was $
The net change by previously authorized Change Orders $ _.,92r�
The (Contract Sum) ( ) prior to this Change Order was $ �%Qv • ®a
The (Contract Sum) {G ) will be (increased) (decreasa4(uttchatr!-tI!i) L
by this Change Order in the amount of $ --•J/ �•`��- a -D
The new (Contract Sum) (^ • ad "tr ^' '^' n^^') including this Change Order will be $
The Contract Time will be (increase ) (deems) (unchanged) by (----i days
The date of Substantial Completion as of the date of this Change Order therefore is��
(Note: This Change Order does not include changes in the Contract Sum, Contract Time or Guaranteed Maximum Price
which have been authorized by Constrrction. Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction Change Directive.)
NOT VALID UNTIL SIGNED BY THE ARCHITEGI, Lunn to I UK 1jimu VYY
y,
ARCHITECT (Finn lame) CONTRACTOR ( irm nam) OWNER (Firm name
R �o`L��o cl ���'va
-S / ADDRESSADDR
ADDR SS
BY (Signature) BY (Signature) BY (Signature) ----- .�
JQ V (Tv", 11111 )
(Ti7�erl name} (Typed rutme)
DATE DATE
—DATE----------------------------------------------------•---.------------------------ -• -
CAUTION: You should sign an original AIA Contract Document, on which this text appears in RED: An oclgtnal assures thafi — - -- - —
changes will not be obscured.
AIA Document G701T"' —2001. Copyright ®1979, 1987, 2000 and 2001 by The American Institute of Architects. All rights reserved. WARNING: This
AIA" Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this Ale Document,
or any portion of it, may result in severe civil and criminal penalties, and will pl eted. Toreport
ort co to the Maximum
copyright violations of AIA Contract Documents. e-mail
Purchasers are permitted to reproduce ten (10) copies of this document when completed.
The American Institute of Architects' legal counsel, copyright@aia,org.
AIAt G701 �' -2001
Documen
Change Order
PROJECT; (Name and address) CHANGE ORDER NUMBER: �' OWNER El
SOL -o T"yit'l5 DATE: /J. /,/, e 9 � ARCHITECT ❑ ��6C1jAxlary ARCHITECT'S PROJECT NUMBER: �%:DPjY�-G
CONTRACTOR O
TO CONTRACTOR: (Name an address) FIELD
11
�1/f,LGD ,g,Go�JS� CONTRACT DATE:/a'� OTHER Cl
Co�j.�0� 0.�5 lu
joD�UGj6�ST��rY� CONTRACT FOR:
The C tl ntra(K is chariaed as follows:
(include. where applicable, any undisputed amount attributable to previously executed Construction Change Directi.ver)
i,v ,tom
OC:7 11W
The original (Contract Sum) ( ) was $
change by previously reviousl authorized Change Orders $
The net cha
The (Contract Sum) ( ) prior to this Change Order was $
The (Contract Sum) (G r 'r N4*X4'" "" °" P) will be (increased) (dZC=a 4(uncizaTt"nd)
by this Change Older in the amount of r
The new (Contract Sum)
. ,,t ra ..�
., m) including this Change Order will be S %_d��i/-
r•--�
The Contract Time will be (iacma=$) (�') (unchanged) by ( daysX409
The date of Substantial Completion as of the date of this Change Order therefore is AAOXX,N 0 2��,
(Note: This Change Order doer not include changes in the Contract Sum, Contract Time or Guctrante ed Maxinturn Price
which have been authorized by Construction Change Directive until the cost and time have been agreed upon by both the
Owner and Contractor, in which case a Change Order is executed to supersede the Construction. Change Directive.)
NOT VALID UNTIL_ S{GNED BY THE ARCHITECT, CONT 'CTOR AND OW ER.
/`r��- CONTRACT R ( irm nam) s OWNER (Firm nam
e
ARCHITECT (Finn name)141
�O�UGTOI(�.�'v`
�R���l�•,�i��l��%�t% ADD- / -
BY l sl S'rl at4n•e. Jel-4
-/�/-`�l._J .y
(Typed narne)
BY (Signature)
{Typed nrmte)
BY(Signnan•4•) ---- --�-(/jam__ ..
(T) ped name) --
DATE--
- - - - - -_- DATE
-------------------------- - — - - -- - - - ---- --- -ears `in t�ED.-An or-igitial-assures-that_-...
CAUTION; You should sign an original AIA Contract Document, on which this text app
changes will not be obscured.
American t Airights f
AIA Document G701TM -2001. Copyright ®1
979
by U.S. oAYght Law andntematonal Treaties. Unauthorized or distribution of AEADocument
AIA Document Is protected
imum
e under the law.
or any portion of it, may result in severe civil and criminal penalties, and Lo pl prosecuted to the xviolations tofnA AoComatt Documents. e-mail
Purchasers are permitted to reproduce ten (to) copies of this document when completed. To report copyright
The American Institute of Architects' legal counsel, copyright@aia.org.