Loading...
001 .- ?PAGGI,MARTIN &DELBENELLP Consulting Engineers & Land Surveyors 56 Main Street Poughkeepsie, New York 12601 845-471-7898 845-471-0905 (FAX) May 24, 2005 VIA FAX & MAIL RECe'VED MAY ? 6 ,,~ Planning Board Town of Wappinger 20 Middlebush Road Wappingers Falls, New York 12590 TOWN CLEHh Reference: Nextel of New York 14 Middlebush Road Dear Board Members: This office is in receipt of the following information regarding the above matter. . Plan Sheets T-1 (Title Sheet), SP-1 (Area, Site & Compound Plan), A-1 (Elevation & Antenna Plan & Details), C-1 (Foundation & Sedimentationl Erosion Control Details), and 2-1 (Equipment Shelter Plans & Details), dated last revised April 8th, 2005, as prepared by APT Engineering, P.C. . Town of Wappinger Special Use Permit I Site Plan Checklist. . Letter of Consent giving Nextel authority to file this Application. . Radio Frequency Affidavit dated April 5th, 2005, as prepared by Yvan Joseph, Radio Frequency Engineer, including supporting documentation. . Radio Frequency Compliance Assessment and Report, dated April 13th, 2005, as prepared by Pinnacle Telecom Group. . Certification that the proposed facility will not cause Radio Frequency Interference dated March 22, 2005, as prepared by Yvan Joseph. . Structural Letter prepared by David B. Granger, P.E. of GPD Associates dated February 22nd, 2005 certifying that the existing tower has the structural capability to accommodate Nextel's proposed facility. . Short Environmental Assessment Form (EAF). . Nextel Wireless Service and Mandate of the Telecommunications Act (1996). We have reviewed all items submitted and would offer the following comments: 1. The Application proposes to install 12 panel antennas on the existing tower at 130' Above Grade Level (AGL), and construct a 10' by 20' unmanned equipment shelter located within the existing fenced in compound. Existing wireless telecommunication facilities currently exist on the tower for Dobson Cellular, and Cingular Wireless, and an application is currently pending for T -Mobile. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., 1.5. Charles R. Del Bene, Jr., P.E. Planning Board RE: Nextel -2- May 24, 2005 2. Since they will be using the existing tower, using the existing entry road and building within the existing fenced in equipment shelter compound, visual and construction related impacts will be minimal. Erosion Control Measures and Notes have been provided on the Plans. 3. All necessary applications and supporting documents are subject to the provisions of Section 240-81 of Town Code, to the satisfaction of the Planning Board, Town Planner, and Town Attorney. 4. All equipment shelter elevations, colors, materials, etc. are subject to the review and approval of the Planning Board and Town Planner. 5. The Radio Frequency Compliance Assessment & Report is subject to the review and approval of the Town's RF Consultant. 6. The structural capability of the existing tower to accommodate the proposed Nextel facility has been certified, signed and stamped by David B. Granger, P.E. of GPO Associates. 7. The Town Attorney should coordinate the appropriate lease payments to be made by the Applicant with the Town Comptroller Please feel free to contact this office if you have any questions regarding this matter. Thank you. Very truly yours, ~g~('/ JEP/PJP:law cc:Hon. Joseph Ruggiero Town Board: File Hon. Gloria Morse Hon. Graham Foster Albert P. Roberts, Esq. Lawrence Bice Tatiana Lukianoff Anthony B. Gioffre, III (Cuddy & Feder) Scott M. Chasse, P.E. (APT Engineering)