May 24, 2005
VIA FAX & MAIL
RECe'VED
MAY ? 6 ,,~
Planning Board
Town of Wappinger
20 Middlebush Road
Wappingers Falls, New York 12590
TOWN CLEHh
Reference: Nextel of New York
14 Middlebush Road
Dear Board Members:
This office is in receipt of the following information regarding the above matter.
. Plan Sheets T-1 (Title Sheet), SP-1 (Area, Site & Compound Plan), A-1
(Elevation & Antenna Plan & Details), C-1 (Foundation & Sedimentationl
Erosion Control Details), and 2-1 (Equipment Shelter Plans & Details), dated
last revised April 8th, 2005, as prepared by APT Engineering, P.C.
. Town of Wappinger Special Use Permit I Site Plan Checklist.
. Letter of Consent giving Nextel authority to file this Application.
. Radio Frequency Affidavit dated April 5th, 2005, as prepared by Yvan Joseph,
Radio Frequency Engineer, including supporting documentation.
. Radio Frequency Compliance Assessment and Report, dated April 13th, 2005,
as prepared by Pinnacle Telecom Group.
. Certification that the proposed facility will not cause Radio Frequency
Interference dated March 22, 2005, as prepared by Yvan Joseph.
. Structural Letter prepared by David B. Granger, P.E. of GPD Associates
dated February 22nd, 2005 certifying that the existing tower has the structural
capability to accommodate Nextel's proposed facility.
. Short Environmental Assessment Form (EAF).
. Nextel Wireless Service and Mandate of the Telecommunications Act (1996).
We have reviewed all items submitted and would offer the following comments:
1. The Application proposes to install 12 panel antennas on the existing tower at
130' Above Grade Level (AGL), and construct a 10' by 20' unmanned equipment
shelter located within the existing fenced in compound. Existing wireless
telecommunication facilities currently exist on the tower for Dobson Cellular, and
Cingular Wireless, and an application is currently pending for T -Mobile.
Joseph E. Paggi, Jr., P.E.
Ernst Martin, Jr., P.E., 1.5.
Charles R. Del Bene, Jr., P.E.
Planning Board
RE: Nextel
-2-
May 24, 2005
2. Since they will be using the existing tower, using the existing entry road and
building within the existing fenced in equipment shelter compound, visual and
construction related impacts will be minimal. Erosion Control Measures and
Notes have been provided on the Plans.
3. All necessary applications and supporting documents are subject to the provisions
of Section 240-81 of Town Code, to the satisfaction of the Planning Board, Town
Planner, and Town Attorney.
4. All equipment shelter elevations, colors, materials, etc. are subject to the review
and approval of the Planning Board and Town Planner.
5. The Radio Frequency Compliance Assessment & Report is subject to the review
and approval of the Town's RF Consultant.
6. The structural capability of the existing tower to accommodate the proposed
Nextel facility has been certified, signed and stamped by David B. Granger, P.E.
of GPO Associates.
7. The Town Attorney should coordinate the appropriate lease payments to be made
by the Applicant with the Town Comptroller
Please feel free to contact this office if you have any questions regarding this matter.
Thank you.
Very truly yours,
~g~('/
JEP/PJP:law
cc:Hon. Joseph Ruggiero
Town Board: File
Hon. Gloria Morse
Hon. Graham Foster
Albert P. Roberts, Esq.
Lawrence Bice
Tatiana Lukianoff
Anthony B. Gioffre, III (Cuddy & Feder)
Scott M. Chasse, P.E. (APT Engineering)