Resolution Authorizing Change Order No. 3 for the Highway Garage HVAC Project
At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New
York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on February 8, 2010.
The meeting was called to order by Christopher Colsey, Supervisor, and upon roll being called,
the following were present:
PRESENT: Supervisor - Christopher J. Colsey
Councilmembers - William H. Beale
Vincent F. Bettina
Ismay Czarniecki
Joseph P. Paoloni
ABSENT:
The following Resolution was introduced by Councilman Beale and seconded by Councilwoman
Czarniecki.
WHEREAS, the Engineers to the Town, Morris Associates Engineering Consultants, PLLC,
have approved Change Order No. 3 to the Contract for the Town of Wappinger Highway Garage HVAC
Project, as per letter dated January 19, 2010, a copy of which has been provided to the Town Board in
advance of this resolution.
NOW, THEREFORE, BE IT RESOLVED, as follows:
1. The recitations above set forth are incorporated in this Resolution as if fully set forth and
adopted herein.
2. The Town Board hereby approves Change Order No. 3 in the amount of Nine Hundred Forty -
Eight Dollars and 75/100 ($948.75), dated December 30, 2009, for the Town of Wappinger
Highway Garage HVAC Project Contract between the Town of Wappinger and Airflow Air
Conditioning, Refrigeration & Heating, Inc., resulting in a new contract sum in the amount of
Two Hundred Fifty -Seven Thousand, Four Hundred Twenty -Two Dollars and 75/100
($257,422.75), for the reasons and associated costs set forth in the letter dated January 19, 2010,
from Morris Associated Engineering Consultants, PLLC.
The foregoing was put to a vote which resulted as follows:
CHRISTOPHER COLSEY, SUPERVISOR Voting: AYE
WILLIAM H. BEALE, COUNCILMAN Voting: AYE
VINCENT F. BETTINA, COUNCILMAN Voting: AYE
ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE
JOSEPH P. PAOLONI, COUNCILMAN Voting: AYE
Dated: Wappingers Falls, New York
2/8/2010
The Resolution is hereby duly declared adopted.
(2(') v
6�
UOHIZC. MASTERSON, TOWN CLERK
MORRIS ASSOCIATES
ENGINEERING CONSULTANT'S, PLLC
'A 9 Elks Lane, Poughkeepsie, New York 12601 Tel: (845) 4543411 Fax: (845) 473-1962
❑ 64 Green Street, Suite 1, Hudson, New York 12534 Tel: (518) 828-2300 Fax: (518) 828-3963
February 5, 2010
Town of Wappinger Town Board
Town Hall
20 Middlebush Road
Wappingers Falls, NY 12590 �`;"~�
Attn: Hon. Christopher Colsey, Supervisor FBS
RE: Highway Services Garage HVAC Project�
Electrical Compliance — Gasoline Pump at Garage #2 /�`�
Revised Change Order #3
Dear Mr. Colsey and Town Board Members:
Enclosed please find a copy of the revised Change Order #3 dated February 2,
2010. This revised change order shall replace the original Change Order #3, dated
December 30, 2009, as further clarification of the work that was performed. Upon
further investigation by the electrical contractor, it was discovered that the circuit for the
gasoline pump in Garage #2 did not meet code, there needed to be a separate ground
circuit. The circuit was replaced with a two pole switch and a new circuit breaker in
Garage #2. Also, it was necessary to remove and replace an electrical sub -panel in
Garage #1 to accommodate the additional circuits that were required. We requested
the contractor, Airflow Air Conditioning, Refrigeration & Heating, Inc. to provide the cost
for material installation. The amount provided is $948.75. Therefore, the new contract
total will be $$257,422.75 ($256,474.00+ $948.75 = $257,422.75).
It should be noted that this work was completed by the electrical contractor in
order to not further delay the installation of the heating units and exhaust fans in Garage
#1.
Please place this on the agenda for the February 8, 2010 Town Board Meeting
for approval of Change Order #'3.
Town of Wappinger
Hon Christopher Colsey
RE: Rockingham Farms
Page 2
April 27, 2009
Please call me at (914) 475-5749 (cell) or (845) 454-3411 Ext. 30 (office) to discuss this
matter prior to the meeting.
Very truly yours,
MORRIS ASSOCIATES
Engineering Consultants, PLLC
�U
Robert J. Gray, PE�-J
Engineer to the Town of Wappinger
RJG/met
Enc.
Cc Albert Roberts, Town Attorney
John Masterson, Town Clerk
Graham Foster, Highway Superintendent
Inez Maldonado
E:ldocuments%T Wappingerla W20081W20888 Highway Gararge Renovations\Revised CO #3 2-5-10.doc
Feb 02 10 09:25a AIRFLOW
8457955742 p.1
WappingerHighwayTmnsmittal
?
A.
G^,lr.:-�• �o�a�!r'�fafa.r'�a�y �e�'ii�ezfrfro�i f%���rrlr.:ar�, �jr..
LETTER OF TRANSMITTAL,
TO: Morris Associates
Engineering Consultants, PLLC
9 Elks Lane
Poughkeepsie, NY 12601
ATTN: Mr. Mike Takacs
DATE: 2/2/10
PAGE 1 OF 2
PHONE: 454-3411
FAX: 473-1962
JOB NO. 09-005
RE: Town of Wappinger Highway Garage — HVAC Improvements, Electrical Remediation &
Firewall Construction
We are sending you ❑ Under separate cover 21 Attached via the following items:
❑ Shop drawings © Prints ❑ Plans O Samples ❑Specifications
❑ Copy of letter HChange Order OProposal
❑ Submittals for your approval ❑Documents described below
Copies Date No. Description
2/2/10 03 Change Order #3 relating to code compliancy for gasoline
pump at garage #$
These are transmitted as checked below:
❑ For your approval ❑ Approved as submitted 17 Resubmit copies for approval
OFor your use ❑ Approved as noted ❑ Submit copies for distribution
❑As requested ❑ Returned for corrections ❑ Return corrected prints
0 For review/comment ❑
O For bids due , 2010 ❑ Prints returned after loan to us
RE1ZARKS:
Mike,
Attached is the Change Order to address the code compliancy issue of improper
switching and overload protection for the gasoline pump at garage #hand the
need to remove and replace the Square -D electrical sub -panel to gain additional
space for required circuits in Garage #1.
Please note that the work has been completed in an effort to fire the new gas furnaces
ASAP and adhere to time constraints of the project schedule.
41Signed- ate:
Copy to:
Feb •02 10 09:25a AIRFLOW
CHANGE ORDER
8457955742
.M
r.o. uax94r Highand,NY 1298 OWNER 0
Phone: (90)795-5740 Fax: (&45)795 742
wNvrairnmraircondirinrtin�.caw ARCHITECT X❑
CONTRACTOR
FIELD Q
OTHER
PROJECT: Town of Wappinger
Highway Garage HVAC Improvements,Firewa
20 Middlebush Rd
'vVdNN � iii cia Faii5, 141,12590
TO: Airflow Air Conditioning, Refrigeration & Head
PO Box 941
Highland, NY 12528
The Contract is changed as hollows:
p.2
CHANGE ORDER* 3
CHANGE ORDER DATE: 02/02/2010
PROJECT ft 09-005
DATE OF CONTRACT: 09121/2009
FOR: Code compliancy for gasoline pump -
garage #1.
Electrical Remediation -Code compliancy issues that are not addressed in bidding/contract documents.
Improper switching & overload protection for gasoline pump, garage 01 and replacement of sub panel in garage #2.
> Furnish and install two -pole pump service switch and new circuit breaker in garage #,Z
> Remove and replace electrical sub panel to accommodate additional circuits required tar garage W.
> Net Change Order#3 cost- Material and Labor = $ 825.00
> 15% allowable override percentage (on site costs only) = $ 123.75
> Change Order#3 Lump Sum Total = $ 948.75
The original Contract Sum was
$240,650.00
The net change by previously authorized Change Orders is
$15,824.00
The Contract Sum prior to this Change Order was
$256,474.00
The Contract Sum will be increased by this Change Order in the amount of
$948.75
The new Contract Sum including this Change Order will be
$257,422.75
The Contract Time wrll be unchanged.
0 days.
The dale cf 8ubstaMIM-1 Cemplet = as of this Change Order "her, fore Is
Unchanged
Not valid until signed by all parties below.
Morris Associates Airflow Air Conditioning, Refrigeration & Heali Town of Wappinger
ARCHITECT CONTRACTOR DWOWER
9 Elks Lane
ADDRESS
Pou epsie, NY 12609
fay (' natul*
Robert Gray
rryped Name)
DATE
PO Box 941 20 Middlebush Rd
ADDRESS ADDRESS
Highland, NY 12526
—Aj Lj�" —
BY ni
JIhil /¢ bure47
(Typed Name)
Wappingers Falls, NY 92590
BY tsilmarure)
039ad Name)
DATE V to DATE
Quantum Software Solutions, Inc. Document
0yk
MORRIS ASSOCIATES
ENGINEERING CONSULTANTS, PLLC
9 Elks Lane, Poughkeepsie, New York 12607 Tel: (845) 4543411 Fax: (845) 473-1962
187 Church Street, Poughkeepsie, New York 12601 Tel: (845) 471-7900 Fax: (845) 471-7901
❑ 389 Fairview Avenue, Hudson, New York 12534 Tel• (518) 828-2300 Fax: (518) 828-3963
E -Mail: morrisassoc iatesCaol,com
January 19, 2010
_...... _... ........... ....
Town of Wappinger Town Board
Town Hall
20 Middlebush Road
Wappingers Falls, NY 12590
Attn: Hon. Christopher Colsey, Supervisor
RE: Highway Services Garage HVAC Project
Electrical Compliance -- Gasoline Pump at Garage #1
Change Order #3
Dear Mr. Colsey and Town Board Members:
........ .
RECEIVED
JAN 2 6 2010
SUPERVISOR'S OFFICE
TOWN OF WAPPINGER
Enclosed please find a copy of Change Order #3. This change order is necessitated in order to
provide code compliance with respect to the switching and overload protection for the gasoline pump at
garage #1. This work includes the installation of two pole pump switch and removal and replacement of
an electrical sub panel. We requested the contractor, Airflow Air Conditioning, Refrigeration & Heating,
Inc. to provide the cost for material installation. The amount provided is $948.75. Therefore, the new
contract total will be $$257,422.75 ($256,474.00+ $948.75 = $257,422.75).
Please place this on the agenda for the February 8, 2010 Town Board Meeting for approval of
Change Order #'3.
Please call me at (914) 475-5749 (cell) or (845) 454-3411 Ext. 30 (office) to discuss this matter
prior to the meeting.
RJG/met
Enc.
Cc Albert Roberts, Town Attorney
John Masterson, Town Clerk
Graham Foster, Highway Superintendent
Inez Maldonado
Very truly yours,
MORRIS ASSOCIATES
EW ering Consultant:
ert J. Gray,
sneer to the
Dec 39 09 09:53a AIRFLOW
CHANGE ORDER
awft*JFWL0VV16~
,Q e"A&*M Wd*lad"&,PAIL'.
P.O. Box 911 Highland, MY 1252a
Phone: (945)79X,',740 Fax: (945)79.L5741
ax'w.airf;1111'RIR 171{1 irllln I Ilr,.dl Iq
8457955742
OWNER
a
ARCHITECT
El
CONTRACTOR
El
FIELD
11
OTHER
❑
p.3
PROJECT: Town of Wappinger CHANGE ORDER #: 3
Highway Garage HVAC Improvements,Firewa
20 Middiebush Rd CHANGE ORDER DATE: 12/3012009
Wappingers Falls, NY 12590 PROJECT #s: 09-005
TO: Airflow Air Conditioning, Refrigeration & Heatl
PO Box 941
Highland. NY 12528
The Contract is changed as follows:
DATE OF CONTRACT: 09/21/2009
FOR: Code compliancy for gasoline pump -
garage #1.
Electrical remediation - code compliancy issues that are not addressed in biddingfcontract documents. Improper switching
and overload protection for gasoline pump, garage 01.
> Furnish and install two pole pump service switch
> Remove and replace electrical subpanel to accommodate the required (neutral break) two pole circuit
breaker serving gasoline pump.
> Net Change Order 93 cost - material & labor = $625.00
> 15% allowable override percentage (on site costs only) = $123.75
> Change Order#3 lump sum total = $ 948.75
The original Contract Sum was
$240,650.00
The net change by previously authorized Change Orders is
$3,208.50
The Contract Sum prior to this Change Order was
$243,858.50
The Contract Sum will be increased by this Change Order in the amount of
$948.75
The new Contract Sum including this Change Order will be
$244,807.25
The Contract Time will be unchanged.
0 days.
The date of Substantial Completion as of this Change Order therefore is
Unchanged
Not valid until signed by all parties below.
Morris Associates Airflow Air Conditioning, Refrigeration & Heati Town of Wappinger
ARCHITECT CONTRACTOR
OWNER
9 Elks Lane PO Box 941
20 Middlebush Rd
ADDRESS ADDRESS
ADDRESS
Poueepsie, NY 12601 Highland, NY 12528
Wappingers Falls, NY 12590
Y (Signature) BY (Signahrre) CandlCe Durkln
BY (Signature)
Robert Gray GDl'p01`4110 SeOre!SrY
(Typed Name) (Typed Na—)
(7Yw Na—)
DATE 3a/Qg
DATE
DATE