Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2010-076
2010-76 Resolution Authorizing Change Order No. 3 for the Highway Garage HVAC Project At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on February 8, 2010. The meeting was called to order by Christopher Colsey, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor - Christopher J. Colsey Councilmembers - William H. Beale Vincent F. Bettina Ismay Czarniecki Joseph P. Paoloni ABSENT: The following Resolution was introduced by Councilman Beale and seconded by Councilwoman Czarniecki. WHEREAS, the Engineers to the Town, Morris Associates Engineering Consultants, PLLC, have approved Change Order No. 3 to the Contract for the Town of Wappinger Highway Garage HVAC Project, as per letter dated January 19, 2010, a copy of which has been provided to the Town Board in advance of this resolution. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby approves Change Order No. 3 in the amount of Nine Hundred Forty - Eight Dollars and 75/100 ($948.75), dated December 30, 2009, for the Town of Wappinger Highway Garage HVAC Project Contract between the Town of Wappinger and Airflow Air Conditioning, Refrigeration & Heating, Inc., resulting in a new contract sum in the amount of Two Hundred Fifty -Seven Thousand, Four Hundred Twenty -Two Dollars and 75/100 ($257,422.75), for the reasons and associated costs set forth in the letter dated January 19, 2010, from Morris Associated Engineering Consultants, PLLC. The foregoing was put to a vote which resulted as follows: CHRISTOPHER COLSEY, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE JOSEPH P. PAOLONI, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 2/8/2010 The Resolution is hereby duly declared adopted. (2(') v 6� UOHIZC. MASTERSON, TOWN CLERK MORRIS ASSOCIATES ENGINEERING CONSULTANT'S, PLLC 'A 9 Elks Lane, Poughkeepsie, New York 12601 Tel: (845) 4543411 Fax: (845) 473-1962 ❑ 64 Green Street, Suite 1, Hudson, New York 12534 Tel: (518) 828-2300 Fax: (518) 828-3963 February 5, 2010 Town of Wappinger Town Board Town Hall 20 Middlebush Road Wappingers Falls, NY 12590 �`;"~� Attn: Hon. Christopher Colsey, Supervisor FBS RE: Highway Services Garage HVAC Project� Electrical Compliance — Gasoline Pump at Garage #2 /�`� Revised Change Order #3 Dear Mr. Colsey and Town Board Members: Enclosed please find a copy of the revised Change Order #3 dated February 2, 2010. This revised change order shall replace the original Change Order #3, dated December 30, 2009, as further clarification of the work that was performed. Upon further investigation by the electrical contractor, it was discovered that the circuit for the gasoline pump in Garage #2 did not meet code, there needed to be a separate ground circuit. The circuit was replaced with a two pole switch and a new circuit breaker in Garage #2. Also, it was necessary to remove and replace an electrical sub -panel in Garage #1 to accommodate the additional circuits that were required. We requested the contractor, Airflow Air Conditioning, Refrigeration & Heating, Inc. to provide the cost for material installation. The amount provided is $948.75. Therefore, the new contract total will be $$257,422.75 ($256,474.00+ $948.75 = $257,422.75). It should be noted that this work was completed by the electrical contractor in order to not further delay the installation of the heating units and exhaust fans in Garage #1. Please place this on the agenda for the February 8, 2010 Town Board Meeting for approval of Change Order #'3. Town of Wappinger Hon Christopher Colsey RE: Rockingham Farms Page 2 April 27, 2009 Please call me at (914) 475-5749 (cell) or (845) 454-3411 Ext. 30 (office) to discuss this matter prior to the meeting. Very truly yours, MORRIS ASSOCIATES Engineering Consultants, PLLC �U Robert J. Gray, PE�-J Engineer to the Town of Wappinger RJG/met Enc. Cc Albert Roberts, Town Attorney John Masterson, Town Clerk Graham Foster, Highway Superintendent Inez Maldonado E:ldocuments%T Wappingerla W20081W20888 Highway Gararge Renovations\Revised CO #3 2-5-10.doc Feb 02 10 09:25a AIRFLOW 8457955742 p.1 WappingerHighwayTmnsmittal ? A. G^,lr.:-�• �o�a�!r'�fafa.r'�a�y �e�'ii�ezfrfro�i f%���rrlr.:ar�, �jr.. LETTER OF TRANSMITTAL, TO: Morris Associates Engineering Consultants, PLLC 9 Elks Lane Poughkeepsie, NY 12601 ATTN: Mr. Mike Takacs DATE: 2/2/10 PAGE 1 OF 2 PHONE: 454-3411 FAX: 473-1962 JOB NO. 09-005 RE: Town of Wappinger Highway Garage — HVAC Improvements, Electrical Remediation & Firewall Construction We are sending you ❑ Under separate cover 21 Attached via the following items: ❑ Shop drawings © Prints ❑ Plans O Samples ❑Specifications ❑ Copy of letter HChange Order OProposal ❑ Submittals for your approval ❑Documents described below Copies Date No. Description 2/2/10 03 Change Order #3 relating to code compliancy for gasoline pump at garage #$ These are transmitted as checked below: ❑ For your approval ❑ Approved as submitted 17 Resubmit copies for approval OFor your use ❑ Approved as noted ❑ Submit copies for distribution ❑As requested ❑ Returned for corrections ❑ Return corrected prints 0 For review/comment ❑ O For bids due , 2010 ❑ Prints returned after loan to us RE1ZARKS: Mike, Attached is the Change Order to address the code compliancy issue of improper switching and overload protection for the gasoline pump at garage #hand the need to remove and replace the Square -D electrical sub -panel to gain additional space for required circuits in Garage #1. Please note that the work has been completed in an effort to fire the new gas furnaces ASAP and adhere to time constraints of the project schedule. 41Signed- ate: Copy to: Feb •02 10 09:25a AIRFLOW CHANGE ORDER 8457955742 .M r.o. uax94r Highand,NY 1298 OWNER 0 Phone: (90)795-5740 Fax: (&45)795 742 wNvrairnmraircondirinrtin�.caw ARCHITECT X❑ CONTRACTOR FIELD Q OTHER PROJECT: Town of Wappinger Highway Garage HVAC Improvements,Firewa 20 Middlebush Rd 'vVdNN � iii cia Faii5, 141,12590 TO: Airflow Air Conditioning, Refrigeration & Head PO Box 941 Highland, NY 12528 The Contract is changed as hollows: p.2 CHANGE ORDER* 3 CHANGE ORDER DATE: 02/02/2010 PROJECT ft 09-005 DATE OF CONTRACT: 09121/2009 FOR: Code compliancy for gasoline pump - garage #1. Electrical Remediation -Code compliancy issues that are not addressed in bidding/contract documents. Improper switching & overload protection for gasoline pump, garage 01 and replacement of sub panel in garage #2. > Furnish and install two -pole pump service switch and new circuit breaker in garage #,Z > Remove and replace electrical sub panel to accommodate additional circuits required tar garage W. > Net Change Order#3 cost- Material and Labor = $ 825.00 > 15% allowable override percentage (on site costs only) = $ 123.75 > Change Order#3 Lump Sum Total = $ 948.75 The original Contract Sum was $240,650.00 The net change by previously authorized Change Orders is $15,824.00 The Contract Sum prior to this Change Order was $256,474.00 The Contract Sum will be increased by this Change Order in the amount of $948.75 The new Contract Sum including this Change Order will be $257,422.75 The Contract Time wrll be unchanged. 0 days. The dale cf 8ubstaMIM-1 Cemplet = as of this Change Order "her, fore Is Unchanged Not valid until signed by all parties below. Morris Associates Airflow Air Conditioning, Refrigeration & Heali Town of Wappinger ARCHITECT CONTRACTOR DWOWER 9 Elks Lane ADDRESS Pou epsie, NY 12609 fay (' natul* Robert Gray rryped Name) DATE PO Box 941 20 Middlebush Rd ADDRESS ADDRESS Highland, NY 12526 —Aj Lj�" — BY ni JIhil /¢ bure47 (Typed Name) Wappingers Falls, NY 92590 BY tsilmarure) 039ad Name) DATE V to DATE Quantum Software Solutions, Inc. Document 0yk MORRIS ASSOCIATES ENGINEERING CONSULTANTS, PLLC 9 Elks Lane, Poughkeepsie, New York 12607 Tel: (845) 4543411 Fax: (845) 473-1962 187 Church Street, Poughkeepsie, New York 12601 Tel: (845) 471-7900 Fax: (845) 471-7901 ❑ 389 Fairview Avenue, Hudson, New York 12534 Tel• (518) 828-2300 Fax: (518) 828-3963 E -Mail: morrisassoc iatesCaol,com January 19, 2010 _...... _... ........... .... Town of Wappinger Town Board Town Hall 20 Middlebush Road Wappingers Falls, NY 12590 Attn: Hon. Christopher Colsey, Supervisor RE: Highway Services Garage HVAC Project Electrical Compliance -- Gasoline Pump at Garage #1 Change Order #3 Dear Mr. Colsey and Town Board Members: ........ . RECEIVED JAN 2 6 2010 SUPERVISOR'S OFFICE TOWN OF WAPPINGER Enclosed please find a copy of Change Order #3. This change order is necessitated in order to provide code compliance with respect to the switching and overload protection for the gasoline pump at garage #1. This work includes the installation of two pole pump switch and removal and replacement of an electrical sub panel. We requested the contractor, Airflow Air Conditioning, Refrigeration & Heating, Inc. to provide the cost for material installation. The amount provided is $948.75. Therefore, the new contract total will be $$257,422.75 ($256,474.00+ $948.75 = $257,422.75). Please place this on the agenda for the February 8, 2010 Town Board Meeting for approval of Change Order #'3. Please call me at (914) 475-5749 (cell) or (845) 454-3411 Ext. 30 (office) to discuss this matter prior to the meeting. RJG/met Enc. Cc Albert Roberts, Town Attorney John Masterson, Town Clerk Graham Foster, Highway Superintendent Inez Maldonado Very truly yours, MORRIS ASSOCIATES EW ering Consultant: ert J. Gray, sneer to the Dec 39 09 09:53a AIRFLOW CHANGE ORDER awft*JFWL0VV16~ ,Q e"A&*M Wd*lad"&,PAIL'. P.O. Box 911 Highland, MY 1252a Phone: (945)79X,',740 Fax: (945)79.L5741 ax'w.airf;1111'RIR 171{1 irllln I Ilr,.dl Iq 8457955742 OWNER a ARCHITECT El CONTRACTOR El FIELD 11 OTHER ❑ p.3 PROJECT: Town of Wappinger CHANGE ORDER #: 3 Highway Garage HVAC Improvements,Firewa 20 Middiebush Rd CHANGE ORDER DATE: 12/3012009 Wappingers Falls, NY 12590 PROJECT #s: 09-005 TO: Airflow Air Conditioning, Refrigeration & Heatl PO Box 941 Highland. NY 12528 The Contract is changed as follows: DATE OF CONTRACT: 09/21/2009 FOR: Code compliancy for gasoline pump - garage #1. Electrical remediation - code compliancy issues that are not addressed in biddingfcontract documents. Improper switching and overload protection for gasoline pump, garage 01. > Furnish and install two pole pump service switch > Remove and replace electrical subpanel to accommodate the required (neutral break) two pole circuit breaker serving gasoline pump. > Net Change Order 93 cost - material & labor = $625.00 > 15% allowable override percentage (on site costs only) = $123.75 > Change Order#3 lump sum total = $ 948.75 The original Contract Sum was $240,650.00 The net change by previously authorized Change Orders is $3,208.50 The Contract Sum prior to this Change Order was $243,858.50 The Contract Sum will be increased by this Change Order in the amount of $948.75 The new Contract Sum including this Change Order will be $244,807.25 The Contract Time will be unchanged. 0 days. The date of Substantial Completion as of this Change Order therefore is Unchanged Not valid until signed by all parties below. Morris Associates Airflow Air Conditioning, Refrigeration & Heati Town of Wappinger ARCHITECT CONTRACTOR OWNER 9 Elks Lane PO Box 941 20 Middlebush Rd ADDRESS ADDRESS ADDRESS Poueepsie, NY 12601 Highland, NY 12528 Wappingers Falls, NY 12590 Y (Signature) BY (Signahrre) CandlCe Durkln BY (Signature) Robert Gray GDl'p01`4110 SeOre!SrY (Typed Name) (Typed Na—) (7Yw Na—) DATE 3a/Qg DATE DATE Quantum Software Solutions, Inc. Document