Loading...
2003-11-06 " . . FELLENZIR LGINEERINGLLP Consu_"~ing Engineers [2J Middletown Office: 22 Mulbeny Street, Suite 2A Middletown, NY 10940 Tel.: (845) 343-1481 Fax: (845) 343-4986 D Poughkeepsie Office: 25 Market Street, Suite 501 Poughkeepsie, NY 12601 TeL (845) 454-9704 Fax: (845) 454-9705 D Port Jervis Office: 31 Front Street Port Jervis, NY 12771 TeL (845) 856-3600 Fax: (845) 856-3734 wwwfellp.eom fe@fellp.eom Professional Engineers Lie. NY,NJ,PA,CT,MA,RJ, VT,FL November 6, 2003 Town ofWappingers 20 Middlebush Road Wappingers, NY 12580 Attn: Joseph Ruggiero, Supervisor Re: Payment Application Fuel Oil Tank Replacement Greystone, Camwath estates FE Project No. 03-339 Honorable Joseph Ruggiero: Please find enclosed application for payment from the contractor, Daren A. Oswald of L & 0 Mechanical. Be advised there is a change order in the amount of$2,160 for recovering and reusing 4,100 gallons of fuel oil. Instead of the Town getting a credit of $.20 per gallon for 4,100 gallons of fuel, which had to be removed and paying $l.OO/gallon or so to replace the existing fuel, Mr. Oswald is charging a lump sum amount of $2, 160 to remove the 4,100 gallons of fuel from the existing tank and installing it in the new tank. By doing this, Mr. Oswald is saving the Town approximately $1,120 (4,100 gallons - $1.00- .20 = $2,160). Please process this change order. A 1 - 12" waterline was discovered during construction, which had to be repaired. This waterline was unknown to the Town, Greystone, this engineer and the contractor prior to excavation. The cost to replace 25' ofthis line is $1,290. The cost to repair this line is fair and the work has been done. Please process the change order for the waterline replacement at $1,290. A 4" waterline was encountered during removal of the 10,000 fuel oil tank. The cost for the repair was $3,695. We feel the cost of the repair is fair and justified. Although, we do regret the inconvenience of the waterline breakage, the repair was accomplished in a timely manner. Additionally, we do thank the assistance of Camo Environmental for their assistance in the repair. Without their assistance, the repair would not have been accomplished as quickly. ..,\ GREYSTONE FUEL OIL TANK REPLACEMENT FE PROJECT NO. 03-339 ,. The project is substantially complete with limited amounts of contaminated materials. We do expect one more additional charge of approximately $300 to $500 for contaminated water and sludge based on the quantity and unit process provided in the contract documents. As of November 6,2003, the project is substantially compact and site is restored. Final closeout is pending documentation. Net change orders are summarized as follows: Recycle fuel oil............................................................................................................................. .$2, 160.00 Relocate 1-1/2" waterline............................................................................................................ ..$1,290.00 Repair of 4" waterline................................................................................................................... .$3 .695.00 Total To Date.......................... ................ ......................... ..................... ............. ............................ $ 7, 145. 00 Projected cost for contaminated material............................................................. ...........................$ 500.00 We ask that the Town Board at this time approve the above-referenced change order for $7,145.00. Should you have any questions, please advise. Sincerely, ~. Eric D. Fellenzer, P.E. Senior Engineer EDF/st cc: Joseph Paggi, P.E., Town Engineer Al Roberts, Esq., Town Attorney Gerald Terwilliger, Town Comptroller Page 2