Loading...
2003-06-10 86/18/2883 12:21 8453434986 FELLENZER ENGINEER PAGE 81/82 F ELLENZER LGINEERINGLLP Consulting Engineers IZIMiddletown Office: 22 Mulberry Street, Suite 2A Middletown., NY 10940 Tel.: (845) 343.1481 Fax: (845) 343-4986 o Poughkeepsie Office: 25 Ma:rket Street, Suite 501 Poughlceepsie, h"l12601 Tel.: (845) 454-9704 Fax: (845) 454-9705 DPort Jervis Office: 32 Front Street Port Jervis, NY 12771 Tel.: (845) 856-3600 Fax: (845) 856-3734 wwwfellp.com fe@fellp.eom Professional Engineers Lie. NY,NJ,PA,CT,MA,Rl. VT.FL FAX MEMO To: Ho. Joseph Ruggiero, 297.4558 cc: Joseph Paggi, Jr. P.E., 471-0905 From: Eric D. FeUenzer PE Date: June 10, 2003 Re: Oil Tank Replacement - Greystone Estates Joe: Pursuant to my conversation with Jay Paggi. P.E., Town Erigineer today about the above referenced project the following is provided. It is my understanding the town has an existing 10,00o-gallon below grade fuel tank for the Greystone property which has recently failed one of its scheduled tests. This tank supplies heating oil to the facility. The tank in question was put into service in 1957. Due to its age and construction, (likely single wall steel). the tank is to be removed. Size, type. and location of replacement tank will be detennined based on existing and future demand load. Due to the fast track nature of this project. a temporary tank may be required. Fellenzer Engineering, LLP has completed nwnerous designs of similar project size and is prepared. to fast track the design and assist ill implementation of this critical project. Our most recent projects have been completed for Monroe - Woodbury and Clarkstown Central School Districts. In order to expedite the project, we would like to meet with facility personnel at the site as soon as practical. 05/10/2003 12:21 8453434985 FELLENZER ENGINEER PAGE 02/02 " FAX MEMO - GREYSTONE ESTATES FE PROJECT NO. 03-339 To assist in tank sizing, past fuel bills as well as building square footages would be helpful. An existing site plan of the project area may also expedite the approval process. Our finn will make ourselves available for a site visit as soon as practical. Should you have any questions, please advise. Sincerely, f. III f--?f~~ Eric D. Fel:~er PE partner ~~ EDF/emh