2003-06-10
86/18/2883 12:21
8453434986
FELLENZER ENGINEER
PAGE 81/82
F ELLENZER LGINEERINGLLP
Consulting Engineers
IZIMiddletown Office:
22 Mulberry Street, Suite 2A
Middletown., NY 10940
Tel.: (845) 343.1481
Fax: (845) 343-4986
o Poughkeepsie Office:
25 Ma:rket Street, Suite 501
Poughlceepsie, h"l12601
Tel.: (845) 454-9704
Fax: (845) 454-9705
DPort Jervis Office:
32 Front Street
Port Jervis, NY 12771
Tel.: (845) 856-3600
Fax: (845) 856-3734
wwwfellp.com
fe@fellp.eom
Professional Engineers
Lie. NY,NJ,PA,CT,MA,Rl. VT.FL
FAX MEMO
To: Ho. Joseph Ruggiero, 297.4558
cc: Joseph Paggi, Jr. P.E., 471-0905
From: Eric D. FeUenzer PE
Date: June 10, 2003
Re: Oil Tank Replacement - Greystone Estates
Joe:
Pursuant to my conversation with Jay Paggi. P.E., Town Erigineer today about the above referenced
project the following is provided.
It is my understanding the town has an existing 10,00o-gallon below grade fuel tank for the Greystone
property which has recently failed one of its scheduled tests. This tank supplies heating oil to the
facility. The tank in question was put into service in 1957.
Due to its age and construction, (likely single wall steel). the tank is to be removed. Size, type. and
location of replacement tank will be detennined based on existing and future demand load. Due to the
fast track nature of this project. a temporary tank may be required.
Fellenzer Engineering, LLP has completed nwnerous designs of similar project size and is prepared. to
fast track the design and assist ill implementation of this critical project.
Our most recent projects have been completed for Monroe - Woodbury and Clarkstown Central School
Districts.
In order to expedite the project, we would like to meet with facility personnel at the site as soon as
practical.
05/10/2003 12:21
8453434985
FELLENZER ENGINEER
PAGE 02/02
"
FAX MEMO - GREYSTONE ESTATES
FE PROJECT NO. 03-339
To assist in tank sizing, past fuel bills as well as building square footages would be helpful. An existing
site plan of the project area may also expedite the approval process.
Our finn will make ourselves available for a site visit as soon as practical.
Should you have any questions, please advise.
Sincerely, f. III
f--?f~~
Eric D. Fel:~er PE
partner
~~
EDF/emh