Loading...
2005-06-13 Cc.. CHAZEN ENGINEERING & LAND SURVEYING CO., P.C. .~ ~-_.---'---"--'-~- -- -'-_.-'--- ,,-,.'-- -. "-_._--~----~".__._..__.__..__.~- ..----~~"----_._~-~_.~._'~--~-- " Dtitchess Counry Office Phone: (845) 454-3980 100 Glen Street, Suite 3C, Glens Falls, New York 12801 Phone: (518) 812-0513 Fax: (518) 812-2205 Web: www.chazencompanies.com Capital District Office Phone: (518) 273-0055 Orange County Office Phone: (845) 567-1133 June 13, 2005 Mr. George Nieves US Army Corps of Engineers Regulatory Branch, Western Permits Section, Room 1937 26 Federal Plaza New York, NY 10278 RECEIVED JUN 1 6 2005 TOWN CLERK Re: Dutchess County Airport Landfill Town of Wappinger, Dutchess County, New York Chazen Job # 40222.00 Dear Mr. Nieves: This is in regard to a Pre-Construction Notice (PCN) that was submitted to you under Nationwide Permit 38 for restoration activities at the Dutchess County Airport Landfill. On April 13, 2005, a J. Garcia, Receptionist, signed for a DHL package submitted to your attention which contained the above referenced PCN. The PCN package described the proposed project, which involves the upgrading and closure remediation activities at the landfill including the installation of a final cover system and methane (gas) venting system to comply with 6 NYCRR Part 360 regulations. These activities are being undertaken in accordance with a signed contained signed consent order1 was administered by the NYSDEC Department of Solid and Hazardous Materials. The PCN included all the requisite information including a wetland delineation, a description of the area of wetland impacts and restoration, and a proposed mitigation plan. The proposed project should have a beneficial impact on water quality by removing a potential source of leachate to Wappinger Creek. Nationwide Permit Condition 13, "Notification", section (a)(3), states, "The prospective permittee shall not begin the activity... unless 45 days have passed from the District Engineer's receipt of the complete notification and the prospective lConsent Order #R3-20020628-75, effective date November 3, 2003 Chazen EnL~ineenng & Land Surw1IlI1g Co., PC En1'troPlall Associatcs, ll1c. THE ~~Wls Chazen En1'lromllental Scn1ircs, Inc. TelePlan Associates, Inc. Mr. George Nieves, Western Permit Chief, ACOE June 7, 2005 Page 2 :'" permittee has not received written notice from the District or Division Engineer. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). TCC has not received any comments from your agency in the :t56 days since your agency received the PCN. As such, it is our understanding that this project has authorization to proceed under the federal program, and that this right to proceed may be modified, suspended or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d)(2). TCC will continue to work with the NYSDEC to obtain an individual Section 401 Water Quality Certificate and a Town of Wappinger Wetland and Buffer Disturbance Permit. In the meantime, if you have any questions regarding the above referenced matter, please do not hesitate to contact me at 518-812-0513. Sincerely, ~~.~~ Barbara B. Beall, PWS Manager, Wetland Services BBB/bbb cc: Ms. Margaret Duke, NYSDEC Region 3 Ms. Gloria Morse, Town Clerk, Town of Wappinger Dave Tompkins, TCC Russell Urban-Mead, TCC R:\4\40222.00\env\2005-6-7-LTR TO ACOE.doc