2000-09-06 r:. '"' I ' DEPARTMENT OF THE ARMY NEW YORK DISTRICT, CORPS OF ENGINEERS JACOB K. JAVITS FEDERAL BUILDING NEW YORK, N.Y. 10278-0090 REPLY TO ATTENTION OF: Regulatory Branch SEP 0 6 2000 SUBJECT: Permit Application Number 2000-00568-YS by Arthur Dedominicus RECEIVED .SEP 1 1 2000 ELAINE SNOWDEN TOWN ClE'RK Michael E. Gillespie Day, Oswald & Gillespie 10-65 Route 82 Hopewell Junction, New York 12533 Dear Mr. Gillespie: On January' 3, 2000,. the New York District Corps of Engineers received a request for a Department of the Army jurisdictional determination and authorization for the above referenced project. This request was made by Day, Oswald & Gillespie, as consultant for Arthur Dedominicus. The area within the project boundary consists of approximately 0.70 acres, in the Hudson River basin, located on New York State Route 9 in the Town of Wappinger, Dutchess County, New York. The proposed project would involve the construction .ofa commercial ,building. , ..... . '. '. .... :: .' . In "the letter 'receivedon January. 3,2000,: your . office c' ;' submitted a proposed delineation of the extent of waters .of the United States within the project boundary. A site inspection was conducted by a representative of this office on May 3, 2000, in which it was agreed that changes would be made to the delineation and that the modified delineation would be submitted to this office.' On August 18, 2000, this office received the modified delineation. Based on the material submitted and the observations of the representative of this office during the site visit, this site has been determined to contain jurisdictional waters of the United States based on: the presence of wetlands determined by the occurrence of hydrophytic vegetation, hydric soils and wetland hydrology according to criteria established in the 1987 IICorps of Engineers Wetlands Delineation Manual, II Technical Report Y-87-1. Based on the above, it has also been determined that the drawing entitled IISite Plan For: Arthur Dedominicus Town of v'Jappinger Dutchess County, New York II, prepared by Day, Oswald & Gillespie, dated December 21, 1999, and last revised August 12, 2000, appears to be an accurate depiction of the extent ~fthe waters of the United States within the project boundary. This drawing indicates that there are three (3) principal wetland areas on the project site. The first wetland (Fed. Wetland "A") is located in the northeastern corner of the site and is approximately 0~003 acres within the project boundary. The second wetland (Fed. Wetland "B") is located along the southern edge of the site and is approximately 0.11 acres within the project boundary. The third wetland (Fed. Wetland "C") is located near the northwestern corner of the site and is approximately 0.03 acres within the project boundary. These wetlands are considered to be above the headwaters. This determination regarding the delineation shall be considered valid for a period of five years from the date of this letter. Enclosed is a Notification of Administrative Appeal Options which provides information on your acceptance of this approved jurisdictional determination. The above referenced drawing also indicates that the total proposed impacts to waters of the United States would involve the discharge of fill material into approximately 0.10 acres of wetlands. Based on the information submitted to this office, our review of the project indicates that an individual permit is not required. It appears that the activities within the jurisdiction of this office could be accomplished under Department of the Army Nationwide General Permit Number 39. The nationwide permits are prescribed as a Final Notice of Issuance, Reissuance, and Modification of Nationwide Permits in the Federal Registers of December 13, 1996 (61 FR 65874) and March 9, 2000 (65 FR 12818) . The work may be performed without further authorization from this office provided the activity complies with the permit conditions listed in Section B, No. 39, Section C, and any applicable regional conditions added by the State of New York, copies enclosed. This determination covers only the work described in the submitted material. Any major changes in the project may require additional authorizations from the New York District. Care should be taken so that construction materials, including debris, do not enter any waterway to become drift or pollution hazards. You are to contact the appropriate state and local government officials to ensure that the subject work is performed in compliance with their requirements. This verification is valid for a period of two years from the date of this letter, unless the nationwide permit is modified, suspended or revoked. This verification will remain valid for two years from the date of this letter if the activity complies with the terms of any subsequent modifications of the nationwide permit authorization. If the nationwide permits are suspended, revoked, or modified in such a way that the activity would no longer comply with the terms and conditions of a nationwide permit, and the proposed activity has commenced, or is under contract to commence, the permittee shall have 12 months from the date of such action to complete the activity. 2 Within 30 days of the completion of the activity authorized by this permit and any mitigation required by this permit, you are to sign and submit the attached compliance certification form to this office. If any questions should arise concerning this matter, please .contact Brian A. Orzel, of my staff, at (212) 264-0183. Sincerely, ~~~~~ ~ George Nieves Chief, Western Permits Section Enclosure cf: NYSDEC ~ Region 3 Town of Wappinger 3