Loading...
1995-10-11 DEPARTMENT OF THE ARMY NEW. YORK DISTRICT. CORPS OF ENGINEERS JACOB K. JA VITS FEDERAL BUILDING. NEW YORK. N.Y. 10278~0090 OCT 1 JJ:)5 ,,1:"- Y TO . '" TTENTIOH OIT Regulatory Branch SUBJECT: Permit Application Number 94-10750-YS by Paul Hunt Michael E. Gillespie Barger, Day & Oswald Consul ting._.Engineers~&. Lando.Suryeyors.q 1065 Route. 82_______H_____ __.___~.__nu___.____n Hopewell Junction, New York 12533 pear Mr. Gillespie: On October 28, 1994, the New York District of the U. S. Army Corps of Engineers received a request for a 'Department of the Army jurisdictional determination for the above referenced project. This request was made by Barger, Day & Oswald, as consultants for Paul Hunt. The site consists of approximately 38.702 acres, in the Hudson River basin, located on Ketchamtown Road in the Town of Wappinger, Dutchess County, New York. The proposed project would involve the construction of a residential subdivision. In the letter received on October 28-, 1994, your office submitted a proposed delineation of the extent of waters o~ the United States within the subject property. A site inspection was conducted by a representative of this office on November 9, 1994, in which it was agreed that changes would be made to the delineation and that the modified delineation would be submitted to this office. On August 29, 1995, this office recelved the modified delineation. Based on the material submitted and the observations of the representative of this office during the site visit, it has been determined that the drawing entitled "9 Lot Subdivision of Lee Knolls For Paul Hunt - Section II - Town of Wappinger - Dutchess -____.__..___..Co. t N ..Y.", "prepared by. Barger ,'-Day&.Oswald,c.....dated....P.E=-.<:ember__~.?t _.___m__'_^" 1994, and last revised July 13,1995 ,.appears _to be an. accurate depiction of the extent of the waters of the United States on the subject property. This drawing indicates that there are three (3) principal wetland areas on the project site. The first wetland (#l-Federal Wetland) is located in the central and northern portions of the property and is approximately 8.83 acres within the subject property. The second wetland (#2 Federal Wetland) is located near the southeastern corner of. the property and is approximately 0.09 acres~ The ~ third wetland (#3 Federal Wetland) is located north and east of the second wetland and is approximately'C.18 acres. It should be. noted that one area, totaling approximately 0.124 acres, as shown on the above referenced drawing, contains fill material within the confines of the delineated wetland. These wetlands are considered to be above the headwaters. This determination regarding the delineation shall be considered valid for a period of five years from the date of this letter. In the submission received on August 29, 1995, it was indicated that the total impacts to waters of the United States would involve the discharge of fill.material into_approximately.,. __~._ "_.___ 0.448 acres of waters of the United States, including_wetlands. ---, --.---.. This includes the 0.124 acres of previous fill, as described above. ,- Based on information submitted to this office, our review of the project indicates that an individual permit is not required. In accordance with the above referenced plan,' it appears that the activities within the jurisdiction of this office could be accomplished under an existing Department of the Army nationwide general permit. The nationwide permits are prescribed in Title 33 of the Code of Federal Regulations (33 CPR 330, Appendix A, No. 26). A public notice issued from this office which describes the nationwide permits and conditions for New York is enclosed for your review. The work may be performed without further authorization from this office provided the' activity complies with the permit conditions listed in ~~pendix A, and any applicable regional conditions added by the State of New York. It should be noted that no development is currently proposed for Lot No. 10 as shown in the above referenced drawing. Any future development within this property, including Lot No. 10i may require further authorization from this office, and may need to be considered cumulatively with the impacts authorized by this' letter. This determination covers only the work described in the submitted material. Any major changes in the project may require additional authorizations from the New York District. Care should betaken so that construction materialsi including debris~ do not enter any waterway to become drift or pollution hazards. You are to contact the appropriate state and local government officials to ensure that the subject work is performed in compliance with their requirements. 2 . This verification of the---Nationwide Permit is valid for a period of two years ~rom the date of this letter, unless the Nationwide Permit is modified, suspended or revoked. This verification will remain valid for two years from the date of this letter if the activity complies with the terms of any subsequent modifications of the Nationwide Permit authorization. If the Nationwide Permits are suspended, revoked, or modified-in such a way that the activity would no longer comply with the terms and conditions of a Nationwide Permit, and the proposed activity has commenced, or is under contract to commence, the permittee shall have 12 months from the .date of such action to complete the activity. If any questions should arise concerning this matter, please contact Brian A. Orzel, of my staff, at (212) 264-0183. Sincerely, \I\~ ilL ~ -furL George Nieves Chief, Western Permits Section Enclosure cf: NYSDEC Region 3 Town of Wappinger 3 .~. --0