Loading...
1999-08-17 '---= PAGGI, MARTIN & DEL BENE LLP Consulting Engineers & Land SUT'Oeyors 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 914-471-0905 (FAX) Iy~ OS///: 4IJS < t:D ~~/N~ 0 1999 O~.v ~NO CI.~~()~N August 17, 1999 Acting Zoning Administrator/ Building Inspector Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Attention: Mark Liebermann Paul Foody Reference: A & W Scrap/Route 90 Dear Mark & Paul: As requested a field inspection was made on the above referenced site on August 17th, 1999 to determine whether or not a grading permit would be required for the work that is being proposed/done by the owners of the above business. When we arrived on the site, we drove down to the north central portion of the site where it appeared as if a filling operation had been taking place utilizing spoil from various construction jobs, including ballast from railroad demolition, concrete, gravel, etc. The fill was approximately 4' in depth and appeared to extend approximately 100'-125' north of what appeared to be existing ground. It was stated to us in the field by the owner of the property that this was the extent of the filling that would be done. However, at the end of the fill a 6' high berm would be placed to visually shield the recycle operation going on in the interior of the site. At this point, it appears as if the filling operation is completed, and all that is left to be done is the grading work at the edge of the fill. I think to have a grading permit at this point in time would be meaningless as it is after the fact. It appears that no natural drainage patterns have been blocked and/or altered. However, in light of the existing vegetation, I would caution the owner that there may be Federally Regulated Wetlands on or near the filling operations. Joseph E. PaW, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Del Bene. Jr., P.E. -.... \... Mark Liebermann Paul Foody RE: A & W Scrap - 2 - August 17, 1999 I would recommend that you document the end of the existing fill as we viewed it today, to insure that the berm that will be placed around the edge of this fill will be done without extending the fill material. I further recommend that once this is completed by the Applicant that he prepare a final plan and present it to your office and possibly the Planning Board for record purposes. If there are any further question or comments, please do not hesitate to contact this office. Very truly yours, ~:;:P:9i~ JEP:law cc: Albert P. Roberts, Esq. Hon. Constance O. Smith, Supervisor Hon. Vincent Bettina, Councilman Hon. Joseph Paoloni, Councilman Hon. Joseph Ruggiero, Councilman Hon. Robert Valdati, Councilman Hon. Elaine Snowden