2008-08-18
AUG-18-2008 MON 11:15 AM VERGILIS,STENGER,ROBERTS
FAX NO. 8452982842
P. 02/03
MEMO
TO: Hon. Christopher Colseyt Supervisor
cc:
Greg W. BaIner, P.E.
Robert 1. Gray, P.E.
David StoIman, AICP
Mike Trempert Camo Pollution Control
Graham Foster, Highway Superintendent
Town Board File
RECEIVED
AUG 1 8 2008
FROM:
Albert P. Roberts, Esq.
August 18. 2008
TO"'"'.' rU::RK
DATE:
RE:
Adams Fairacre Farms
Site Plan Route 9
File No. 12949.0495
I would li.ke to set aside some time to review the details of the proposed Agreement
between the Town and Adams Fairacre Fanus. The summary the Adams Proposal is as
follows:
> AdanlS will construct water and sewer lines from Acura Site southward to
near FowIerhouse Road and then burrow under Route 9 to the Adams' Site.
). The water and sewer lines will be dedicated to the Town and will be
constructed to specifications accrued by the Town's Conflict Engineer and
Dutchess County Health Department.
). The construction and dedication of the water and sewer lines will be in Heu of
any surcharge to join the water and sewer systems.
}> Town will provide up to a maximum of 25,000 gallons of water per day.
). Town will convey unneeded portions of Old Route 9 to Adams.
)> Adams will petition the Town rOt' an extension of the United Wappinger
Water District.
}> Adams will request to become LicenseelTenant to the Sewer Improvement
(Wappingers Sewer Transmission/Treatment Improvement Area Phase 3~A)
· Note: Technically I believe that this parcel is included with the overall
geographical boundaries of the Origina! Wappingers Sewer
Transmissionlrreatment Improvement Area Phase 1 and 2~ which
O:\Wappio.ger\PlanoingBolll'd\Adams Fairacre Farms\08!808 Memo to Colsey.doc
AUG-18-2008 MON 11:15 AM VERGILIS,STENGER,ROBERTS
FAX NO. 8452982842
P. 03/03
constructed the sewer main to Trl-Municipal Sewer Plant, mn is not
illC,luded in Phase 3-A which was the last seWet lateral extension.
· Since sewer is provided pursuant to a 12-C Improvement Area, Adams
cannot petition to extend; this is another reason to have special
legislation to convert to a Sewer District.
Attached please find a copy of the proposed Agreement. Please review and comment and
be prepared to discuss at either a staff meeting or meeting to be called by Chris.
0:\ WllJ>plnp\PlanningBoard\Aclams Fairam Farms\08J S08 Memo to Colsey.4oc: