Loading...
1992-11-12 ~ . . alpinear.res PLANNING BOARD TOWN OF WAPPINGER NY RESOLUTION APPROVING ARCHITECTURAL SUBMISSION ALPINE SHOPPING CENTER Tax Map Designation: 19-6157-02-707773; p/o 19-6157-02-766660 RESOLUTION NUMBER: 238 AR DATE: November 12, 1992 At a special Meeting of the planning Board of the Town of Wappinger, held at the Town Hall, 20 Middlebush Road, Wappingers Falls NY on the 12th day of November 1992. The meeting was called to order by Chairman Keller, and upon roll being called the following were: PRESENT: Chairman, Donald Keller William Parsons Phil DiNonno Michael Franzese Hugo Musto ABSENT: John Perillo Chris Simonetty The following resolution was offered for adoption by Mr. DiNonno who moved this adoption, seconded by Mr. Musto to wit: WHEREAS, in accordance with the Town of wappinger Zoning Law as last revised, The Alpine Company of poughkeepsie has submitted to the Planning Board an application for the approval of a site plan titled: ALPINE COMMONS SHOPPING CENTER prepared by C. T. Male Associates, P. C. located on sheet 6157-02, parcels 707773; 687634; and part of 766660 of the Town of Wappinger Tax maps, and WHEREAS such application has received conditional approval by resolutions of the planning Board dated May 2, 1991; July 30, 1992; september 9, 1992 and October 19, 1992, and Planning Board Resolution Alpine Shopping Center - Architectural Review Dated: 11/12/92 Page 2 WHEREAS such resolutions required various conditions to be completed, submissions to be delivered and/or modifications to submitted maps to be made, and WHEREAS the applicant has submitted for review the following Architectural Material: ARCHITECTURAL PRESENTATION MATERIAL; The following materials were submitted as part of the original submission: a) Red Brick Sample b) Sign letter; individually lit sample c) Dryvit (stucco) wall outerface & insulation system sample d) EDPM membrane material sample e) Metal canopy roofing sample f) Aluminum Storefront Frame sample, and will be utilized in the construction of liB. J. IS Wholesale" retail structure, and The following materials were submitted as part of the November 12, 1992 submission for the "stop & Shop Grocery Store" structure: a) Cedar (wood) Stripping Material sample b) Red Brick sample c) Front & side elevation plans indicating location of various materials and Planning Board Resolution Alpine Shopping Center - Architectural Review Dated: 11/12/92 Page 3 WHEREAS the applicant has revised & modified maps to the following listed dates: Sheet 1 1A 2 2A 3 4 5 6 7 7A 8 9 10 11 12 12A 12B 12C 12D 12E 12F 13 14 14A 15 16 16A 16B 17 18 18A 18B 18C 18D 19 Title Cover Sheet & Index Site Layout Plan site Layout Plan Grading Plan Grading Plan utility Plan Erosion Control Plan Lighting Plan Standard Water Domestic Water Domestic Water Sanitary Sewer Sanitary Sewer Misc. Details Standard Storm Details Town Water Main Extension Off-site Water Main Off-site Water Main Off-site Water Main Water Main Profile Water Main Profile Water Main Profile Landscape Plan (by Charles Gabion Wall Elevations Retaining Wall Details Misc. Cross Sections (5/11/92) Details Supply Detail Supply, Elec. Details Details Plans May LS) Fire Pump Station Plans & Details Fire Pump Station Elec. Details Fire Pump Station Structural Details Fire Storage Tank Details Wastewater Treatment Facility (7/7/92) Wastewater Treatment Facility Wastewater Treatment Facility Wastewater Treatment Facility Wastewater Treatment Facility Signing and Striping Plan (by J. Collins) Dated Undated 5/18/92 5/18/92 5/18/92 5/18/92 5/18/92 5/18/92 5/18/92 12/1/90 7/13/92 10/5/92 12/1/90 12/1/90 5/18/92 12/1/90 2/7/91 8/12/92 8/12/92 8/12/92 10/6/92 10/6/92 10/6/92 5/18/92 5/18/92 12/1/90 5/11/92 7/13/92 10/5/92 5/11/92 7/13/92 10/5/92 10/5/92 10/5/92 10/5/92 10/28/92 6/12/92 last revised: 11/03/92 9/28/92 11/03/92 10/27/92 10/27/92 11/03/92 10/09/92 9/15/92 10/05/92 9/02/92 9/02/92 9/28/92 7/14/92 10/06/92 10/06/92 11/03/92 7/14/92 7/14/92 9/02/92 or 7/14/92 10/05/92 10/05/92 10/05/92 10/26/92 10/28/92 11/03/92 Planning Board Resolution Alpine Shopping Center - Architectural Review Dated: 11/12/92 Page 4 NOW THEREFORE BE IT RESOLVED; that the ARCHITECTURAL SUBMISSION MATERIAL for B. J. 's Warehouse Club is deemed complete and acceptable to the Planning Board, and BE IT FURTHER RESOLVED that the ARCHITECTURAL TREATMENT of the stop & Shop Grocery Building, be modified in the following manner: For the south elevation (front face) of the building: the proposed narrow Cedar Band, Red Brick facing and Shingled roof is acceptable, although a better grade of roof shingling should be considered; the wide, diagonal, cedar facing of the "store front" element shall be replaced by a "stucco" or "dryvit" material in a contrasting color. For the East elevation (side face): a "split faced" block shall be used. For the North elevation (rear face): a plain concrete block is acceptable. For the West elevation (side face): The architectural treatment of the satellite stores, when constructed shall continue the approved south elevation treatment around this side of the structure, in a manner to be further reviewed and accepted by the Board. The applicant shall submit to the Board, prior to February 1, 1993, the proposed architectural treatment of the satellite stores. BE IT FURTHER RESOLVED that there shall be not construction on the "face" (South Elevation) of the "stop & Shop" building until the final materials are approved by the Planning Board, and Planning Board Resolution Alpine Shopping Center - Architectural Review Dated: 11/12/92 Page 5 BE IT FURTHER RESOLVED that the following maps, as dated, are deemed to be the maps approved (as to details of construction) in compliance with the requirements of the aforesaid Resolutions of Conditional Approvals. Sheet 1 lA 2 2A 3 4 5 6 7 7A 8 9 10 11 12 12A 12B 12C 12D 12E 12F 13 14 14A 15 16 16A 16B 17 18 18A 18B 18C 18D 19 Title Cover Sheet & Index Site Layout Plan Site Layout Plan Grading Plan Grading Plan Utility Plan Erosion Control Plan Lighting Plan Standard Water Domestic Water Domestic Water Sanitary Sewer Sanitary Sewer Misc. Details Standard Storm Details Town Water Main Extension Off-site Water Main Off-site Water Main Off-site Water Main Water Main Profile Water Main Profile Water Main Profile Landscape Plan (by Charles Gabion Wall Elevations Retaining Wall Details Misc. Cross Sections (5/11/92) Details Supply Detail Supply, Elec. Details Details Plans May LS) Fire Pump Station Plans & Details Fire Pump Station Elec. Details Fire Pump Station structural Details Fire Storage Tank Details Wastewater Treatment Facility (7/7/92) Wastewater Treatment Facility Wastewater Treatment Facility Wastewater Treatment Facility Wastewater Treatment Facility Signing and Striping Plan (by J. Collins) Dated Undated 5/18/92 5/18/92 5/18/92 5/18/92 5/18/92 5/18/92 5/18/92 12/1/90 7/13/92 10/5/92 12/1/90 12/1/90 5/18/92 12/1/90 2/7/91 8/12/92 8/12/92 8/12/92 10/6/92 10/6/92 10/6/92 5/18/92 5/18/92 12/1/90 5/11/92 7/13/92 10/5/92 5/11/92 7/13/92 10/5/92 10/5/92 10/5/92 10/5/92 10/28/92 6/12/92 last revised: 11/03/92 9/28/92 11/03/92 10/27/92 10/27/92 11/03/92 10/09/92 9/15/92 10/05/92 9/02/92 9/02/92 9/28/92 7/14/92 10/06/92 10/06/92 11/03/92 7/14/92 7/14/92 9/02/92 or 7/14/92 10/05/92 10/05/92 10/05/92 10/26/92 10/28/92 11/03/92 . . Planning Board Resolution Alpine Shopping Center - Architectural Review Dated: 11/12/92 Page 6 . The question of the adoption of the foregoing resolution was duly put to a vote on roll call, which resulted as follows: Donald Keller William Parsons Phil DiNonno Michael Franzese Hugo Musto John Perillo Chris Simonetty voting voting voting voting voting absent absent aye aye aye aye aye The resolution was thereupon declared Administrator DATED: November 12, 1992 Wappingers Falls New York. HER TOWN