1990-03-14
..
i 14-14-10 (2/87)-9c
-,,'
617 .21
Appendix I
State Environmental Quality Review
FINDINGS STATEMENT
SEaR
Pursuant to Article 8 (State Environmental Quality Review Act--SEQR) of the Environmental
Conservation Law and 6 NYCRR Part 617, the Town of Wappinger Planning Board
as lead or involved agency, makes the following findings.
Name of Action:
The Alpine Companies
~
Description of Action: Shopping Center
Location: (Include street address and the name of the municipality and county.)
Route #9 South of ~yers Corners Road on the eastern side of Route #9
Agency Jurisdiction(s):
See Attached Distribution
Date Final EIS Filed:
March 14, 1990
Facts and Conclusions in the EIS Relied Upon to Support the Decision:
(Attach additional sheets, as necessary)
See Attached Findings of Fact
RECEIVED
JUN 6 1990
ELAINE SNOWDEN
TOWN CLERK
Identification Number
Name of Action hI" Alpinl? r()mp;:mip~
I
i CERTIFICATION OF FINDINGS TO APPROVE/FUND/UNDERTAKE
Having considered the Draft and Final EIS, and having considered the preceding written facts and
conclusions relied upon to meet the requirements of 6 NYCRR 617.9, this Statement of Findings
certifies that:
1. The requirements of 6 NYCRR Part 617 have been met;
2. Consistent with the social, economic and other essential considerations from among the
reasonable alternatives thereto, the action approved is one which minimizes or avoids adverse
environmental effects to the maximum extent practicable; including the effects disclosed in the
environmental impact statement, and
3. Consistent with social, economic and other essential considerations, to the maximum extent
practicable, adverse environmental effects revealed in the environmental impact statement
process will be minimized or avoided by incorporating as conditions to the decision those
mitigative measures which were identified as practicable.
4. (and, if applicable) Consistent with the applicable policies of Article 42 of the Executive Law,
as implemented by 19 NYCRR 600.5, this action will achieve a balance between the protection
of the environment and the need to accommodate social and economic considerations.
Herbert
Town of
~lerk Town at WRppinEer P1RnninE RnRrn
itle of Responsible fflcia
J. Levenson, Clerk to the
Name 01 Responsible OffiCial
Wappinger Planning Board
n/46QO
ate
Post O~fice Box 92, 20 Middlebush Road, Wappingers Falls, New York 12590
Aooress of Agency
OR
CERTIFICATION OF FINDINGS TO DENY
Having considered the Draft and Final EIS, and having considered the preceding written facts and
conclusions relied upon to meet the requirements of 6 NYCRR 617.9, this Statement of Findings
certifies that:
1. The requirements of 6 NYCRR Part 617 have not been met;
2. Consistent with the social, economic and other essential considerations from among the
reasonable alternatives thereto, the action denied is one which fails to adequately minimize
or avoid adverse environmental effects to the maximum extent practicable; and/or
3. Consistent with social, economic and other essential considerations, to the maximum extent
practicable, adverse environmental effects revealed in the environmental impact statement
process cannot be adequately minimized or avoided by the mitigation measures identified
as practicable.
4. (and, if applicable) Consistent with the applicable policies of Article 42 of the Executive Law,
as implemented by 19 NYCRR 600.5, this action will not adequately achieve a balance between
the protection of the environment and the need to accommodate social and economic con.
siderations.
l"';'~ .~"'. ." '," .., ,.' .~
, . - .' . . .~ .''''l.
\ t ,:6"\ "1 ".~,. 7. ..~: ~..",
'- ...A. J . ,...j \..... ., *,. e
Name of Agency
$l~~~~ure;"f Re,. filfr~ible Official
V1."". . ll,.;:,:"
Name of Res:Jonsible OffiCial
,,:' lil.IF..P.t,f3e.;;P-9r,fI:o!e,0.tflclal
L;J\.IWU-", .,..IP..t_
>t;';1,.1:) ~~'lJ,-) f
Dale
ACcress 0' Agency
cc: Other Involved Agencies and the Applicant
.
Mailing List for Alpine Companies for the Statement of Findings
1. Comm. Thomas Jorling
NYS DEC
50 Wolf Road
Albany, NY 12533
14. Conservation Advisory Council
Town of Wappinger
P. O. Box 324, 20 Middlebush Road,
Wappingers Falls, NY 12590
2. Dutchess Co. Planning Dept.
47 High Street
Poughkeepsie, NY 12601
15. Arch. Review Board
Town of Wappinger
POBox 324, 20 Middle Bush Rd.
Wappingers Falls, NY 12590
3. Dutchess Co. Soil & Water Cons.
Rou te 1144
Poughkeepsie, NY 12601
16. Mr. Tyde Richards
The Alpine Companies
1029 North Road
Westfield, Ma. 01085
4. NYS DEpt. of Transportation.
4 Burnett Blvd.
Poughkeepsie, NY 12602
17. Mr. Robert Palmer, Esq
% Palmer & Gabel
90 Market Street
Poughkeepsie, NY 12601
5. Tri-Municipal Sewer Commission
Sheafe Road
Wappingers Falls, NY 12590
6. NYS Dept. of Enviornmental Cons.
211 S. Paltz Corners Raod
New Paltz, NY 12561
7. Dutchess Co. Health Dept.
22 Market Street
Poughkeepsie, NY 12601
8. Dutchess Co. DPW
22 Market Street
Poughkeepsie, NY 12601
9. Village of Wappingers Falls
% Rudifoff and Rohde
328 Main Mall
Poughkeepsie, NY 12601
10.Enviornmental Mgmt. Council
P. O. Box 259
Farm and Home Bureau
Millbrook, NY 12545
11 . Town Baord
Town of Wappinger
PO Box 324, 20 Middlebush Road
Wappingers Falls, NY 12590
12. Mrs. Elaine Snowden, Town Clerk
Town of Wappinger
P.O. Box 324, 20 Middlebush Road
Wappingers Falls, NY 12590
13.Mr. Thomas Logan, Assessor
__Town of Wappinger
P. O. Box 324, 20 Middlebush Road,
Wappingers Falls, NY 12590
,/
. ./)
May 30, 1990
1
Town of wappinger Planning Board
Lead Agency Findings statement on the Final
Environmental Impact statement for the
Alpine Shopping Center
I. Background
1. The Applicant proposes to construct and operate a
shopping center to be known as Alpine Shopping Center
(the "Project"). Upon completion of all phases, the
project is proposed to consist of a combined gross
leasable area (GLA) of 202,600 square feet. The GLA at
Project completion has served as the basis for
determination of potential environmental impacts.
2. The proposed site for Alpine Shopping Center is a
single parcel of land totalling 60.4 +/- acres,
generally bounded by U.S. Route 9 and various highway
commercial uses to the west, vacant commercial land to
the north, residential uses to the east and highway
businesses to the south. The Project site is located
within a Shopping Center (SC) District, under the
current Town of wappinger zoning Ordinance. The
Project is an allowed use in the SC district upon site
plan approval by the Town of Wappinger Planning Board.
3. The Shopping Center will be constructed in two phases.
The first phase to be constructed will be not more than
110,000 s.f., will be the southernmost segment of the
project, configured approximately perpendicular to
Route 9, and will entail no construction within the
"wetland" area or its buffer zone. A site plan for
this segment will be submitted for review.
The 2nd phase, approximately 92,600 s.f., will occupy
the more northerly portion of the site and will be
configured parallel to U.S. Route 9. A site plan to
include phase 2 will be required to be approved by the
Board prior to the issuance of any building permit for
phase 2. Submission of the phase 2 site Plan will
require a reopening of the SEQRA process. The Planning
Board may require the updating of the submitted
DEIS/FEIS upon which these findings are based.
The applicant has indicated a willingness to pursue the
approvals necessary for the Phase 2 construction.
A. The applicant is currently processing a
Wetlands permit for construction in the
wetlands as shown on Phase 2
2
B. The DEC has declared the application
incomplete because of lack of findings. The
adoption by The Planning Board of these
findings will allow the D.E.C. to continue
their review and act on such application.
C. We expect the D.E.C. to act on the permit
within the next 6-12 months. The Board will
terminate the approval process for Phase 2 if
the applicant has not received D.E.C.
approval within 18 months from the date final
site plan approval for Phase 1 has been
granted.
D. We will allow the applicant 18 months from
D.E.C. permit approval to complete a DEIS for
Phase 2, otherwise the Planning Board will
terminate the approval process for Phase 2.
4. Access to the Project will be furnished by an "T" style
intersection onto u.s. Route 9, approximately 150 feet
south of an existing culvert for Wappinger Creek
("Hunter Creek"). Necessary off site traffic
improvements to mitigate traffic impacts from each
phase will be provided by the Applicant subject to
review by the New York state Department of
Transportation as part of the Highway Work Permit
process. Details of the parking areas and ring road
will be subject to the subsequent site plan review
process.
5. Alpine Shopping Center, including parking areas and
boundaries, is proposed to be landscaped with a variety
of tree and plant species compatible with local soils
and climate. The overall effect will be to create a
suitable buffered and attractive visual environment.
All landscaping and buffering is subject to review and
approval at time of site plan review.
The environmental review of Alpine Shopping Center has
afforded the Planning Board and other involved agencies
an understanding of the potential environmental impacts
that might arise from the construction and operation of
the Project. The applicant has presented detailed
information regarding potential impacts, most notably
slope and wetland impacts, and including many other
impacts which can be reasonably anticipated and
analyzed. Analysis of other details, such as traffic,
parking, landscaping, drainage, and implementation of
stormwater management controls identified in the EIS
have been disclosed and proposed mitigation measures
identified, and will receive further consideration as
part of the subsequent detailed site plan approval
process by the Planning Board.
3
The Planning Board has determined that the findings may
be broken down into specifics relating to Phase 1 and
Phase 2 construction.
Based upon a review of the DEIS and FEIS, construction
of Phase 1, with no intrusion into the wetland area or
its associated buffer area, will have little or no
significant impact on such wetland areas. The general
impacts with Phase 1 are the normal, short term impacts
associated with construction.
Phase 2, on the other hand, will also include the
impacts associated with filling and replacement of the
wetland areas, within the permit process and
requirements of the New York state D.E.C.
Findings in this statement are confined to Phase 1
Construction. Separate findings will be required for
Phase 2.
II. Land Use and zoning
1. The property is shown for "Office" use on the Town
Comprehensive Plan adopted August 8, 1988.
2. The site is located in an SC, Shopping Center district
in which retail shopping centers and restaurants are
uses permitted by right subject to site plan review by
the Town Planning Board.
3. The site is predominantly vacant-with the exception of
one single family home and barn under the control of
the Applicant.
4. The proposed Project will provide a high quality
shopping facility for the benefit of area residents,
will increase the taxable value of the project site,
and will provide numerous jobs to area residents.
Findinqs
The Planning Board therefore finds that:
The Project is consistent with surrounding land uses
and zoning.
No adverse impacts on existing land uses will result
from the construction of the Project.
4
III. Traffic and Roadways
1. A traffic study was prepared by John Collins Engineers,
P.C. to evaluate the traffic impacts from the project
at full buildout on the surrounding road network. The
traffic study evaluated impacts from a Project larger
(238,000 s.f. GLA) than the fully developed project
that is now proposed (approximately 110,000 sf GLA in
Phase 1 and 202,000 total sf GLA in Phase 2) and
therefore provided a conservative estimation of
impacts. The study formulated recommendations for
highway improvements which would be required upon full
buildout to avoid or mitigate, to the maximum extent
practicable, such impacts.
2. The traffic study took into account existing traffic
volumes on the roadways and intersections in the
vicinity of the Project and then projected those
volumes to a 1992 design year utilizing a 2% background
growth factor. The traffic study thus provides a
sufficient basis for a reasoned determination of future
impacts and mitigation measures required.
3. The New York state Department of Transportation
(NYSDOT) has reviewed the traffic study and determined
in their comment letter of 9/18/89 that the existing
traffic, area growth factor, site generated volumes and
distribution were all reasonable.
4. The NYSDOT has indicated that it prefers that the Site
access driveway be constructed as- a "T" intersection
rather than as an "English Couplet" intersection.
Analysis of the "T" intersection has demonstrated that
acceptable levels of service will be achieved with this
configuration and it is therefore proposed to be
implemented.
The following improvements will be implemented by the
Applicant at the Site access driveway and Route 9 prior
to completion of Phase 1 of the Project.
a. Construct a full movement driveway connection
to Route 9 consisting of two entering and two
exiting lanes.
b. Construct a separate left turn lane
southbound and a separate right turn lane
northbound at this new intersection.
c. Install a new, actuated traffic signal to be
coordinated with the traffic signals at Myers
Corners Road and Old Hopewell Road.
5
5. A NYSOOT Improvement Contract calls for reconstruction
of the intersection of Route 9 and Myers Corners Road.
Following the completion of the NYSDOT improvements to
this intersection, acceptable levels of service will be
achieved, including the traffic generated by the
Project. The existing northbound left turn lane may
have to be lengthened to store the left turn volume. A
determination on the need to lengthen the left turn
lane will be made by the NYSDOT as part of the Highway
Work Permit Process for Phase 2. This improvement may
be required to serve Project generated traffic from
Phase 1 and will be the subject of a NYSDOT highway
work permit.
6. The Applicant will install a traffic signal at the
intersection of Middlebush Road and Route 9D when
signal warrants are met. It is anticipated that this
would occur upon construction of Phase 2.
7. Improvements to Route 9 and Old Hopewell Road will be
required under the No-Build condition during the design
year. These improvements include the provision of
separate right turn lanes on the northbound and
southbound approaches of Route 9. In addition the
eastbound approach will have to be modified to provide
a three-lane section including a separate left turn
lane, one through lane and a separate right turn lane.
Also, the westbound approach will have to be
coordinated with the improvements on the opposite
approach and should consist of a separate left turn
lane and a combined through/right turn lane.
The improvements at this intersection are required
under the No-Build condition and are not a result of
Project generated traffic. Improvements to this
intersection will be required during Phase 1. The
responsibility for these improvements will be
determined by the NYSDOT during the Highway Work Permit
process. It is expected that the Applicant will be
responsible for constructing same portion of these
improvements, as determined during the Highway Work
Permit process.
8. The Applicant will construct right turn lanes on all
approaches to the intersection of Old Hopewell Road and
Route 90 as part of the improvements required for Phase
2 .
6
9. with respect to construction traffic, impacts will be
temporary, short term and local in nature. Delivery of
construction equipment and materials will be scheduled
for off-peak traffic hours to avoid conflicts. A
Maintenance and Control of Traffic Plan will be
implemented during construction to mitigate impacts on
traffic disruption from construction activities.
10. The Project site plan provides for the construction of
a future bypass road between Old Hopewell Road and
Myers Corners Road to be located along the eastern
portion of the Applicant's property. The Applicant
will make available a right of way of sufficient width
to accommodate this road. The location of the right of
way will be determined during the site plan approval
process.
Findinqs
The Planning Board makes the following findings with respect
to traffic.
1. Traffic impacts from a first Phase not to exceed
110,000 square feet GLA can be adequately mitigated
with implementation of the above listed improvements.
IV. Air Quality
1. Data from air monitoring stations within the Hudson
Valley Air Quality control Region indicate that
Dutchess County's air quality is.quite good, with all
stations reporting measured pollutant levels below
established thresholds.
2. Analysis of the impacts of additional traffic on the
existing levels of carbon monoxide (CO) at the site was
performed. Results of this analysis indicate that
computed levels of CO for the existing, no-build and
build conditions are 6.2, 6.5 and 6.6 ppm,
respectively. These CO levels are all below the New
York state Department of Environmental Conservation
(NYSDEC) standards, and therefore no adverse air
quality impacts are anticipated as a result of the
project.
7
3. The Planning Board has found that the increase in
airborne particulates generated by construction at the
site will be adequately mitigated by the use of
emission control and anti-pollution devices on all
construction equipment and by rapid revegetation and
landscaping which will retard off-site migration of
fugitive dust. Conventional water spray trucks will be
used to maintain optimum grading conditions, minimize
disturbed area, insure proper control of compaction and
minimize dust dispersion.
Findings
The Planning Board makes the following findings with regard
to impacts on air quality.
1. Construction activity generation of airborne
particulates will be adequately mitigated.
2. Exhaust emissions will be mitigated and are considered
short-term, temporary and local in nature.
V. Noise
1. The project site is located directly adjacent to u.s.
Route 9. As a result, highway traffic is the
predominant noise source affecting the area.
2. Noise produced during construction will be intermittent
in nature and of short duration, and will not exceed
Government Service Administratio~ standards.
Construction noise is specifically exempted from Town
of wappinger noise regulations in Article IV, Section
483.1 of the Town Zoning Ordinance.
3. Cutting and filling will be balanced as much as
possible to reduce the need for blasting. Buildings
and other improvements will be located so as to
minimize the need for blasting to the maximum extent
practicable. Rippable material will be maintained over
the area to be blasted, or blasting mats may be used if
overburden is not available. A blasting plan will be
developed which will incorporate use of the correct
size shot, the use of closely spaced, drilled holes
located near free faces, delay blasting caps, a
sequential timer and notification of nearby residents.
4. Other than residences, there are no sensitive receptors
near the site (schools, hospitals, etc.). To reduce
potential noise impacts on nearby residents, the
Applicant has agreed to construct sound absorbing
barriers such as fences or tree buffers. The location
of such buffers will be determined during the site plan
review process.
8
5. Construction equipment will be properly muffled and
maintained to reduce noise and vibration.
6. Noise resulting from increased traffic would account
for an approximately 0.5 dBA increase over existing
noise levels at the site. Therefore, traffic generated
noise will not cause a significant increase in ambient
noise levels in the area.
Findinqs
with respect to project generated impacts related to noise,
the Board finds:
1. Construction noise due to traffic will not
significantly impact surrounding land uses.
2. Adequate noise control measures will be implemented
during blasting.
3. Construction noise will be temporary, short term and
local in nature.
4. Traffic noise impacts on surrounding residential uses
will not be significant.
5. Noise at project completion will be within established
federal guidelines.
6. Noise buffers such as wooden barriers or tree plantings
will be utilized to further reduce noise impacts on
surrounding residential uses. The location of such
buffers will be determined during the site plan review
process.
VI. Historical and Archaeological Resources
The Planning Board has examined a stage lA archaeological
analysis of the project site. The site is not listed on
either the state or Federal Registers of Historic Places.
The New York state Museum and state Historic Preservation.
Office do not report any archaeological sites on the Alpine
Shopping Center site. However, since construction
activities could potentially disrupt historical or
archaeological resources at the site, a stage IB
Archaeological Field Survey is required to be completed and
submitted to the NYSDEC prior to beginning construction.
9
Findinqs
with regard to archaeological resources, the Planning Board
finds that:
1. The Project will have no impact on historical or
archaeological resources on the state or National
Registers of Historic Places.
2. Although no archaeological sites are reported on the
project site, a stage 1B field Survey will be conducted
prior to commencing construction.
VII. Wetlands
1. Approximately 25 acres of the northern portion of the
Project Site is located in a DEC classified wetland.
The wetland is designated by the DEC as WF-3 and is a
Class III wetland.
2. The DEIS and FEIS contained detailed descriptions of
the wetlands functions and benefits provided by the
portion of WF-3 on the Project Site. The wetland is
dominated by purple loosestrife. The major function
and benefit provided by the wetland is flood and
stormwater control.
3. Phase 1 of the Project will not involve any
encroachment of regulated wetlands areas. Under the
plans submitted in the EIS, Phase 2 will require the
removal and filling of approxima~ely 9.6 acres of
wetland WF-3.
4. Since the primary function of the wetland is to provide
flood and stormwater control, the Applicant has
developed a mitigation plan to replace the loss of
flood storage. A stormwater basin will be constructed
which will balance the amount of stormwater storage
lost. The net effect will be duplication of the
wetlands flood control function. The Applicant will be
required to demonstrate to the Planning Board during
the site plan review process that any filling in the
wetlands areas will not cause an adverse impact on
floodplains located downstream of the Project site.
5. The loss of low quality purple loosestrife dominated
wetlands habitat is proposed to be mitigated by the
construction of a detention area which will provide
open water habitat for birds and amphibians as well as
some "edge" species of wetland vegetation. The intent
of this mitigation is to provide increased diversity
and quality of habitat.
10
6. The Applicant has made application to NYSDEC for a
wetlands permit for Phase 2 involving filling of
wetlands. It is recognized that before any activities
may occur in the regulated wetland or buffer, a permit
must be obtained from the DEC. Further, the DEC,
during the permit review process, may require
additional mitigation or alterations to the project to
mitigate impacts. The Planning Board recognizes DEC's
expertise in the area of wetlands and further
recognizes that site plan approval for any portion of
the project requiring wetlands fill will also require
DEC approval. The Phase 2 site Plan involving wetlands
fill will be subject to modification based on input
from NYSDEC and the Planning Board during site plan
review.
Findinqs
The Planning Board Finds that:
1. Construction of Phase 1 will have little or no
significant impact on such wetland.
2. Any activities in wetlands are subject to approval by
NYSDEC. The Planning Board specifically recognizes
DEC's expertise in this matter and further recognizes
that additional mitigation or alterations to the
Project may be required by the DEC. Approval of
wetlands portions of the Project are contingent on such
approval.
3. The Applicant must demonstrate during the Site Plan
review of Phase 2 that the proposed stormwater
mitigation measures will result in no increase in
downstream and/or upstream floodwater levels as a
result of any fill activities in the wetland.
VIII. Sewage Disposal
1. The preferred method of sewage disposal for the Project
involves connecting into the Town Trunk Sewer Line in
the Route 9 right of way which is anticipated to be
constructed before the Project is completed.
2. Should the Town Sewer Trunk Line not be extended on a
timely manner, compatible with the Applicant's
development plans, then the Applicant will construct a
force main to the Village of Wappingers Falls.
11
3. The Tri-Municipal Sewage Treatment Plant has adequate
capacity to accept the sewage flows to be generated by
the Project. A letter agreeing to accept the flows
shall be secured from the Commission prior to site plan
approval.
4. In the event a force main is to be constructed, Alpine
will meet with the Village and Town prior to design of
the force main route to select an alignment acceptable
to the municipalities which will minimize impacts from
utility relocations and pavement removal and
replacement.
5. If Alpine constructs the force main to the village,
then Alpine will disconnect from the force main and
connect to the Town's trunk main if and when such a
connection becomes possible.
Findinqs
The Planning Board finds that:
1. The Tri-Municipal Wastewater Treatment Facility has
adequate capacity to accept wastewater flows from the
Project as indicated by Rudy Laprr, P.E.
2. Measures have been proposed to ensure that impacts from
construction of the proposed force main, if utilized,
will be minimized. These measures include those noted
for construction impacts on soil 'resources noted in
Section 4.01.09 of the DEIS.
IX. Water Supply
1. The Project will be supplied with potable water by on-
site wells. Three drilled wells were tested and
demonstrated a safe yield of 11, 12 and 8 gpm each (31
gpm, total). The anticipated daily water use for the
Project at full build-out is approximately 27,000 gpd.
this use will require the continuous pumping of 18.75
gallons per minute from well sources. With the three
existing wells, the average usage can be supplied by
two wells with one out of service. However, to satisfy
concerns of reliability, the Applicant will develop a
fourth on-site well prior to completion of Phase II.
12
2. Fire flows will be provided for both phases by
connection to the Central Wappinger Water Improvement
Area (CWWIA), at the corner of Myers Corners Road and
Spook Hill Road. However, the CWWIA is not presently
in a position to extend potable water service to
outside customers. When the CWWIA is able to provide
potable water to the site, the Applicant will abandon
its well supply. Other users could also tie into the
system at that point in time.
Findings
With regard to Water Supply, the Planning Board finds that:
1. with a properly sized pipe adequate water pressure and
flow exist to serve the fire flow demands of the
Project via connection to the CWWIA system.
2. The proposed on-site well water supply system will be
adequate to provide the Project with a reliable supply
of potable drinking water, in compliance with all
applicable State and local standards. A fourth well
will be developed prior to completion of Phase II.
x. Solid Waste
1. Solid waste generated during construction of the
Project will be transported by a contract hauler to an
approved construction and demolition debris landfill.
2. operations at the Project will generate approximately
1/2 ton of solid waste per day. The waste will be
transported to the Dutchess County Resource Recovery
Facility by a private contract wastehauler. The
facility presently handles approximately 400 tons of
solid waste per day. The increase due to the Project
will be minimal.
Findinqs
The Planning Board finds:
1. Construction debris will be disposed of in an approved
disposal facility off-site.
2. Solid waste generated will be transported by a private
contract waste hauler to an approved disposal facility.
3. Construction and operation of the Project will have no
adverse impact on solid waste disposal in Dutchess
County.
13
XI. Soil Erosion and Sediment control
1. A total of approximately 28 +/- acres of land on the
southern portion of the site will be disturbed during
the construction of the Project upon completion of
Phase 2.
2. Deep hole test pits were excavated on the project site
to determine the location and extent of various soil
types, water table levels and bedrock depths.
3. The Applicant has prepared grading plans and erosion
control plans which will limit the amount of sediment
leaving the site both during and after construction.
These plans call for soil stockpiling during
construction and the use of haybales or filter fabric
fences and jute mesh. Soil amendments and rapid
revegetation will help reduce erosion. Filter barriers
will be periodically cleaned and repaired as required.
4. An approximately 25 foot cut is proposed on the
southern boundary of the site as shown on the site plan
contained in the FEIS. The building is proposed to be
"stepped" so that a grade change will occur from west
(lowest level) to east (highest level). This design
reduces the cut from the 40 foot +/- originally
proposed. The Applicant has continued to explore ways
in which the cut can be reduced, including locating the
rear of the building adjacent to the southern property
line and increasing the grade change in the "stepped"
design. There are access considerations which limit
the extent to which the building can be "stepped." The
Applicant has also explored reducing the angle of the
cut on the southern property line; however this would
require moving the Phase I developed area into the
regulated wetland. The Planning Board will continue to
explore ways in which the cut can be reduced, such as
building placement and grading, during the site plan
review process. Safety concerns from the cut can be
mitigated by fencing and the use of retaining walls.
Findinqs
The Planning Board finds that:
1. Implementation of the controls identified in the
Grading Plan, and erosion control and the mitigating
measures listed under section 4.01.09, of the DEIS will
adequately limit the amount of sediment leaving the
site both during and after construction.
2. Use of water trucks will reduce wind and water erosion
on disturbed areas.
14
3. A maintenance program of sediment control devices will
ensure proper functioning of such devices.
4. The Applicant and Planning Board have explored ways to
minimize the cut required on the southern property
line. These include "stepping" the building and
locating the building closer to the property line. The
Planning Board will make a final determination on the
size of the cut during the site plan review process.
XII. Visual Character
1. During construction the site will be maintained in a
neat orderly manner. Crews will remove waste for
collection prior to disposal on a regular basis. All
construction debris will be promptly removed from the
site by a private wastehandler and disposed of in an
approved construction and demolition debris landfill.
2. The site is presently vacant, except for a single
residence and driveway. The shopping center and
associated parking will replace this existing use.
3. The proposed shopping center buildings are to be
reviewed during the site plan review process. Existing
trees will be retained where possible and the site will
be extensively landscaped, subject to site plan review,
with various plantings on the northern, eastern and
southern boundaries to buffer the existing residential
areas. The western boundary wil~ be partially
landscaped to provide screening of the parking area
from u.s. Route 9, and in such a way as to maintain
optimum site distances at driveway intersections.
4. Timers will be used to mitigate visual impacts from the
lighting, which will be directed downward, to minimize
"splash" off the site.
Findinqs
1. The Planning Board finds, with respect to the visual
impact of the project, that mitigation measures to be
used during construction, including landscaping
screening and lighting, will mitigate impacts on the
visual character of the area.
15
XIII. Community services, Fiscal and Economic Impacts
1. The Project will have no adverse impacts on local
services and utilities during construction.
2. The Project site is located approximately three minutes
from the firehouse at Hughsonville. Internal fire
protection will be provided by fire fighting
sprinklers, and external fire hydrants around the
buildings. Fire water will be provided by connection
to the CWWIA system. Adequate fire flows and pressures
will be provided per National Fire Insurance Standards.
3. The Sloper-Willen community Ambulance Service has
indicated that there is no problem responding to the
emergency needs of a new shopping center.
4. The County Sheriff and the NYS Police have indicated
that they can furnish adequate police protection to the
site.
5. The Applicant will make a series of improvements to the
existing roadway network to mitigate any potential
traffic impacts resulting from the Project. The
Phasing of these improvements is discussed in Section
III of these findings.
6. The Project is expected to generate revenues for the
Town of Wappinger, Wappinger's Central School District
and Dutchess County. Municipal revenues include the
collection of Town property tax in the amount of
$90,467. One time permit fees are estimated at
$195,097. School district taxes to the Wappinger
Central School District are estimated at $135,183
annually. Sales taxes are estimated at $1,789,234
annually, with $340,806 going to the County.
7. The construction of the Project will generate
approximately 400 full time equivalent jobs both on and
off-site. Full-time employment resulting from the
Project is estimated at 400 positions, and $3,000,000
per year in wages.
Findinqs
With respect to community service, fiscal and economic
impacts, the Planning Board finds:
1. The Projects' construction and operation will have a
significant beneficial impact on area employment
opportunities.
16
XIV. public Safety
1. The on-site fire protection system will meet the
approval of the local Fire Advisory Board, as well as
all local, state and Federal (NFPA) insurance company
specifications. System plans will be presented to the
Fire Advisory Board during site plan review.
2. As discussed in Section XI of these findings, The
Applicant is exploring ways to reduce the cut on the
southern property line. Safety concerns will be
addressed by fencing along the top and bottom of the
rock cut. A retaining wall may be necessary to insure
the stability of the cut. A final design of the
retaining wall, if required, will be determined during
the site Plan Review process.
3. Blasting will be necessary in order to grade the site.
Blasting will conform with Town of Wappinger Local Law
Number 6 of 1981. section 4.01.08 of the DEIS provides
mitigating measures to be taken to minimize impacts
from blasting.
Findinqs
1. With regard to public safety, the Planning Board finds
that adequate public safety services are available and
adequate safety measures will be implemented during and
after construction to ensure public safety and the
general welfare of the Town of w~ppinger.
xv. stormwater and streams
1. In order to mitigate changes in stormwater runoff from
impervious surfaces, such as buildings and parking
lots, a stormwater management system incorporating
detention ponds is proposed to be constructed on the
site.
2. The proposed Project will reduce the floodwater storage
capability of the floodplain area upstream of the U.S.
Route 9 culvert. In order to offset the reduction in
storage, a stormwater detention pond is proposed on a
tributary of Wappinger Creek ("Hunter Creek"). The
volume of the pond will be sized to offset the fill
that will be placed in order to prevent flooding
upstream.
17
3. A HEC-2 analysis will be performed during the site plan
review phase for any portion of the Project involving
fill in the wetlands area in order to evaluate the
floodway and floodplain boundaries on site and the
effect of filling the wetland area. If this analysis
indicates that filling results in a increase in water
level for the 100 year storm, the Applicant will be
required to mitigate this impact by providing
additional flood storage area so that no increase in
flood levels will occur, or the site Plan will be
modified to reduce the proposed fill.
4. The stormwater management system will be constructed to
convey stormwater from most rainfall events to a
detention basin, from which the water will be
discharged to the groundwater or will pass through
control structures to channels connecting with the
Wappinger Creek tributaries to the north. Stormwater
from very high rainfall events will be conveyed by
overland flow to Wappinger Creek Tributary 1.
5. During construction, numerous erosion and sediment
control measure will be implemented to prevent impacts
on the site surface water resources from erosion
runoff.
Findings
with respect to stormwater and streams, the Planning Board
finds:
1. Erosion and sediment control measures to be undertaken
during construction will prevent adverse impacts on
Wappinger Creek from construction activities.
2. The proposed stormwater management plan to be
implemented after construction will prevent adverse
impacts on Wappinger Creek from sediment loading and
will prevent an increase in stormwater discharge off-
site after the construction of the Project.
3. If during the review of the Phase 2 site Plan, the
grading plan is determined to adversely impact the
upstream backwater condition, the Site Plan will be
required to be modified to mitigate this impact.
18
XVI. Alternatives
1. Alternative uses which were examined for the site
included a 40,000 square foot motor vehicle sales and
service facility, a 550,000 square foot professional
office complex, a 238,500 square foot office complex
and a 525,000 square foot Conservation Office Park.
The Planning Board has determined that each of these
alternative uses would have adverse impacts on the area
similar to the project; however these alternatives
would not provide the degree of positive impacts as
would the project, including employment and tax
opportunities to be generated by Alpine Shopping
Center.
2. A smaller scale retail facility was examined (95,000
square feet). Such a facility would generate demands
on local services and utilities similar to the Project
at full build-out, but would produce less sales tax
revenue and provide fewer jobs. Phase 1 of the project
is proposed for approximately this size.
3. A larger scale shopping center is not considered
feasible due to environmental and site constraints.
Findinqs
The Planning Board finds that alternative land uses and
alternative project scales have been adequately examined and
that the proposed Project represents ~ reasonable and viable
use and scale.
XVII.
Adverse Impacts Which Cannot Be Avoided
The Board finds that impacts which cannot be avoided consist
primarily of short term activities which are local in nature
and have no significant effect on the environment.
Mitigation in the form of fencing and a retaining wall, if
required, is proposed for the cut on the southern property
line. During the Site Plan Review process the Planning
Board will explore ways to reduce the cut, such as modifying
the grading plan or locating the building closer to the
southern property line. Impacts on wetlands are proposed to
be mitigated by enhancement of habitat and duplication of
the flood control function. It is recognized that NYSDEC
may require additional mitigation and project alteration as
part of its permitting process. Impacts of stormwater
runoff and flood control will be adequately mitigated by the
proposed stormwater control plan.