1989-07-21 , PAGGI & MARTIN Consulting Engineers & Land Surveyors 54-56 Main Street Poughkeepsie, New York 12601 914-471-7898 July 21, 1989 RECEIVED JUL 25 1989 Mr. Herb Levenson Zoning Administrator Town of Wappinger Box 324 20 Middlebush Road Wappingers Falls, New York 12590 ELAINE H. SNOWDEN Town Cltrk Reference: Alpine Shopping Center D.E.I.S. Dear Mr. Levenson: I am in receipt of the above D.E.I.S. dated JUly, 1989 and have reviewed the same for completeness only and report the following: 1) Water Supply and Distribution: The preparer of the D.E.I.S. states that a third well must be drilled to supply the required amount for the development. It would be my opinion that the testing procedures used for development of this well should be stated in conjunction with the two wells that have already been drilled. Taking this one step further, the procedures for the pump test already done should be more clearly stated. Were the pump tests run simultaneously, and if not, what are the effects of each well on the other? As you also recall, one of the most important requirements stipulated at the scoping session was the testing of adjacent wells to determine the possible effects of the newly proposed wells on the existing wells. This work was scheduled coordinated with the Health Department and done. However, I find none of the results in the D.E.I.S. The Planning Board should make a determination as to whether or not the third well should actually be drilled and tested prior to acceptance of the D.E.I.S. for completeness. If they do not deem that it should actually be drilled, I would suggest very strong language as to the extent of the water needed in the third well to make the project viable. JosephE. Paggi,Jr., P.E. Ernst Martin, Jr., P.E., L.S. . Mr. Herb Levenson Zoning Administrator Town of Wappinger Box 324 20 Middlebush Road Wappingers Falls, New York 12590 Page Two JUly 21, 1989 Reference: Alpine Shopping Center D.E.I.S. 2) Sanitary Sewer Collection and Disposal: I find the section regarding the Town's proposed plan to sewer this area somewhat lacking. The Developer's Engineer has quoted a preferred alternative of going into the Village of Wappingers Falls collection system at Franklindale Avenue and has also stated what the Town's proposed plans for their Wappingers Sewer Transmission District. However, the D.E.I.S. does not state which alternative will be chosen and which is the backup. Another area that should be explored is the possibility of the timing of the Town plan not coinciding with the construction of the plaza. What will happen if and when the Town plan becomes a reality and the Plaza is already hooked into the Village collection system? 3) Storm Sewer: I have reviewed the Chapter for completeness and find it acceptable at this time. I have limited my comments to the three areas listed above and would recommend that the Town Zoning Administrator receive comments on all other associated issues (i.e. traffic, wetlands, etc.) from the appropriate review agency. Please note for the record that I have reviewed these items for completeness only and have not done a substantive review at this point in time. I would recommend that my items listed above should be included in the D.E.I.S. prior to the Planning Board accepting it as complete. Very truly yours, ~~tuw~ Joseph E. Paggi, Jr., P.E. . JEP:hs cc: Planning Board Ray Arnold cc: Town Board 1~~f~1 88-003(85) I~