Loading...
1988-07-26 July 26, 1988 LOFEK CONSTRUCTION CORPORATION 270 NORTH PLANK ROAD NEWBURGH, NY 12550 ATTN.: Stehpen C. Fekishazy Secretary RE: The Bedding Gallery Dear Sir: At the July 11, 1988 meeting of the Town of Wappinger Plan- ning Board, a motion was made by Mr. Mills, seconded by Mr. Parsons to adopt the following resolution: BE IT RESOLVED THAT THE PLANNING BOARD OF THE TOWN OF WAP- PINGER HEREBY GRANTS FINAL SITE PLAN APPROVAL to the Bedding Gallery Town of Wappinger, Dutchess County, New York, dated 9/28/87,and revised 4/28/88, 5/6188, 6/3/88, and 1016/88, prepared by Lynch and Cornacchini, RA and Subject to the Following Conditions. 1. Approval of the Dutchess County Dept. of Health on water supply and sewage disposal shall be obtained prior to final approval. 2. Approval of Town Highway Superintendent shall be obtained on entrance and exit prior to final approval. 3. Downstream drainage fee of $. 15 a square foot for newly constructed roofed areas and areas covered with impervious material shall be paid prior to the issuance of a building permit. 4. An erosion control plan shall be approved by the Engi- neer to the Town and the Conservation Advisory Council prior to final approval in accordance with the requirements of the Town of Wappinger Soil Erosion & Sediment Control Ordinance. -2- 5. An application shall be made to the Zoning Administrator for a grading permit which shall meet the Soil Erosion & Sediment Control Ordinance requirements, including submission of a plan showing design and materials. A month by month schedule shall be submitted to the Zoning Administrator prior to final approval. 6. A drainage plan shall be approved by the Engineer to the Town prior to final approval. The Conservation Advisory Council shall be given an opportunity to review the plan. 7. A copy of the building plans shall be supplied to the Fire Prevention Bureau for their review prior to the iss- uance of a building permit. 8. The Fire Prevention Bureau shall inspect the premises prior to the issuance of a Certificate of Occupancy. 9. Any signs to be located on the premises and/or building shall comply with the requirements of the Town of Wappinger Zoning Ordinance. 10. Adequate screening shall be required for the refuse en- closure as determined by the Planning Board. 11. Site Lighting shall be submitted and reviewed by the Zoning Administrator prior to final approval to insure that there will be no glare onto roadways and/or adjacent resi- dential areas. 12. Landscaping shall be required ~s determined by the Planning Board. 13. A certified, as built plan shall be submitted and app- roved by the Planning Board prior to the issuance of a Certificate of Occupancy. 14. Upon completion of all requirements set forth in the action approving the site plan, 6 copies of the site plan shall be submitted for the Planning Board Chairmans sign- ature. 15. ABACA REQUIREMENTS: New Addition with match existing colors and ribbs metal paneling. Will match existing concrete block "everything to match existing" Recommend to plant white line on South of Border of property 5 foot on center. . -3- 16. Jay paggi Letter Dated 7/6/88 - Comment 1 of our April 25, 1988 letter is still outstanding. 17. It is the opinion of the builder's architect that the additional runoff from this site will not have any adverse impact on the existing drainage facilities in the street. In my opinion, he has not demonstrated this. He should pro- vide documentation to show what the actual effect would be. 18. The applicant has changed the proposed gravel parking area to a black top parking area. This is acceptable to this office. 19. The Town Planner should complete the necessary SEQR documents. Vote: Mr. Hawksley-aye Mr. Mills-aye Mr. Simonetty+aye .. / C~V~F.. ... tfU..l~~tO.~59_L------._____ . l:' A-/(1:- (.~>,/ )<:/ .... - ibert/J.jLevenson Clerk, '~n of wappinger Mr. Keller-aye Mr. Parson-aye Planning Board Ijs CC: Elaine Snowden, Town Clerk Jay Paggi, Engineer to the Town Raymond Arnold, Planner Fire Prevention Bureau Conservation Advisory Council Louis A. Loiacone, Owner Herbert J. Levenson, zoning Administrator Tim Classey, Building Inspector