2011-2742011-274 Resolution Authorizing Changes in Required Improvements for Shamrock Hills Subdivision At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, , 20 Middlebush RoadWappingers Falls, New York, on July 25, 2011. The meeting was called to order by Christopher Colsey, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers ABSENT: Christopher J. Colsey William H. Beale (Arrived 6:32PM) Vincent F. Bettina Joseph P. Paoloni Ismay Czarniecki The following Resolution was introduced by Councilman Beale and seconded by Councilman Paoloni. WHEREAS, during the construction of the Shamrock Hills Subdivision, site conditions required certain deviations from the approved design specifications for the sewer lines and sewer easements, specifically the inability to provide grades as designed and the inability to provide adequate access to certain portions of the sanitary sewer lines; and WHEREAS, the aforementioned changes were approved by the Engineers to the Town; and WHEREAS, these changes will result in additional maintenance man hours whenever maintenance is required; and WHEREAS, to mitigate the additional costs incurred by the Town, the current owner of the subdivision, Toll Brothers, has agreed to pay for additional equipment for the newly purchased Town Vactor as well as to pave the access way to the sewer pump station located within the subdivision. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby acknowledges that site conditions dictated a deviation from the specifications for the construction and installation of portions of the sewer line easements in the Shamrock Hills Subdivision, specifically the inability to maintain the grading within the easement areas as well as the inability to provide designed access to portions of the sanitary sewer easement and that in consequence thereof, the inability to construct the sewer lines as designed will result in additional man hours for required maintenance. 3. The Town Board hereby approves the modifications to the design of the sewer line and sewer easement through the Shamrock Hills Subdivision, as approved by the Engineers to the Town, on condition that the current owner of the subdivision, Toll Brothers, paves the access way to the sewer pump station located within the subdivision as well as pay for the following upgrades to the newly purchased Town Vactor: A. 1,000' hose reel in lieu of the standard reel; B. An additional 200' of hose for the router; and C. A hose pinch reel to ensure the extra hose will properly coil on the reel. 4. The Town Board estimates that the cost of the aforementioned upgrades and equipment to the Vactor is approximately $4,246.00 and that the cost of the paving of the access way to the sewer pump station will be significant with the cost thereof totally paid by Toll Brothers. The foregoing was put to a vote which resulted as follows: CHRISTOPHER COLSEY, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE ISMAY CZARNIECKI, COUNCILWOMAN Voting: ABSENT JOSEPH P. PAOLONI, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 7/25/2011 The Resolution is hereby duly declared adopted. UJQ., HN C. MASTERSON, TOWN CLERK Jul 20 11 11:23a Graham Foster SUPERINTENDENT GRAHAM FOSTER ti���1t. foster: u.:m�4nn:l�aonineers. �:s (845) 297-9451 - Office (845) 656-5031 - Cel l (845)298-6324—F x 8452980524 p.2 TOWN OF WA.PPINGER. SUPRINTENDEN'T OF HIGHWAYS GARAGE ADDRESS 10 HIGHWAY DRIVE 20 MIDDLEBUSH ROAD WAPPINGERS FALLS, NV 12590 July 19, 2011 TO: TOWN BOARD PLANNING BOARD FROM: GRAHAM FOSTER SUBJECT: SHAMROCK HILLS SUPERVISOR CHR[STOPHER J. COLSEY TOWN BOARD William H. Beale Vincent Bettina Ismay Czamiecki Joseph P. Paoloni During the construction of the Shamrock Hills Subdivision, some deviations from the approved plan were matte by the developer regarding grading and access to the sanitary sewer system. These changes will result in additional maintenance man hour; when we experience problems and for routine maintenance. Since many of the problems with access to the system were caused by the original approved design, no easy changes are possible. To help with required maintenance, additional equipment will be required for our Vactor sewer cleaner. The developer, Toll Brothers, have agreed to consider paying for these upgrades. 1.) A 1,000' hose reel in place of the 800' standard reel 2.) An additional 200' of hose for the router 3.) A hose pinch reel to ensure the extra hose will properly coil on the reel The cost of these upgrades is $4,246.00. 1 feel with these upgrades we will minimize the problems we will encounter while trying to maintain this system. If Toll Brothers agrees to this condition we should make it part of our agreement to take over their subdivision. Cc: AI Roberts Casey Devlin (Toll Brothers) Mike Tremper Greg Bolner Jul 2011 11:23a Graham Foster SUPERIN'rENDEti I' GRAHAM POSTER VIV.-toctcriutcnti3inl�c�ppingcr�.0 (845) 297-9451 - Office (845) 656-5031 - Call (845) 298-0524 -- Fox DATE: Ifel FROM: 6---C 8452980524 p.1 TOWN OF WAPPINGFR SUPIUNTENDENT OF HIGHWAYS GARAGE ADDRESS 10 HIGHWAY DRIVE 20 MIDDLEBUSH ROAD WAPPINGERS FALLS, NY 12590 FAX #: 4f � - ) q • % `S+ PAGES (including cover sheet): �- /-,, , COMMENTS: SCPERVISOR CHRISTOPHER J. COLSEY TOWN BOARD William H. Beale Vincent Bettina Ismav Czarniccki Joseph P. Paoloni