2006-06-02
PAGGI,MARTIN &DELBENELLP
Consulting Engineers & Land Surveyors
56 Main Street
Poughkeepsie, New York 12601
845-471-7898
845-471-0905 (FAJe)
June 2, 2006
VIA FAX & MAIL:
Planning Board
Town of Wappinger
20 Middlebush Road
Wappingers Falls, New York 12590
Reference: BRH Subdivision: Eck Road I Ada Drive
RECEIVED
JUN 0 6 2006
TOWN CLERK
Dear Board Members:
On April 27th, 2006 this office received Sheets 1 through 17A of the BRH Subdivision, dated
last revised November 12th, 2005 as prepared by Richard Barger, P.E., L.S.
All outstandina enaineerina related concerns from our December 5th. 2005 review letter have
been addressed. We have also reviewed the May 31S\ 2006 Resolution of Final Subdivision
Approval and would note the following. Since the Final Resolution has since been revised,
this Compliance review supercedes our May 11th, 2006 correspondence.
. 4.a: The Zoning Administrator should verify that the Resolution has been signed.
. 4.b: The appropriate Town official should verify that the recreation fees have been paid.
. 4.c: Satisfied. The well and septic systems for Lot 7 have been approved by the DCHD.
The Applicant has also added a note to the Plans indicating that Lot 7 is not to be
developed until such time as municipal sewer and water are made available.
. 4.d: Pond grading is shown on Sheet 13, along with maintenance notes, the party
responsible for maintenance, etc. The Town Planner should verify that all appropriate
landscaping has been shown, and that this item has been addressed to his satisfaction.
. 4.e: Satisfied. The Drainage District was authorized by the Town Board on February
13th, 2006.
. 4.f. Satisfied. All outstanding comments from our December 5th, 2005 review letter have
been addressed.
. 4.g: The Town Attorney should verify that all legal issues pertaining to the extension of
Ada Drive have been addressed.
. 4.h: The appropriate Town official should verify that the inspection escrow account has
been established.
. 4. i: The Applicant should provide a Performance Bond in conformance with our
September 28th, 2005 Bond Calculation, to the satisfaction of the Town Attorney.
Joseph E. Paggi, Jr., P.E.
Ernst Martin, Jr., P.E., L.S.
Charles R. Del Bene, Jr., P.E.
Planning Board
RE: BRH Subdivision
-2-
June 2, 2006
· 4.j: The requested note should be added to the Plans.
· 4.k: All required forms and documents are subject to the review and approval of the Town
Attorney.
· Easements: This office has received and reviwed easements prepared by Richard
Barger, P.E., L.S. entitled - "Eck Road" (Nov. 11, 2005), "Drainage Easement Over and
Through Lots 2 & 3" (Nov. 11, 2005), "Drainage Easement Over and Through Lots 5, 6 &
7" (Dec. 16,2005), "Ada Drive" (June 19, 2004) and "Sewer Line Easement" (June 19,
2004). We would advise that all metes and bounds descriptions match those shown on
the Plans dated last revised November 12th, 2005.
Please feel free to contact this office if you have any questions regarding this matter.
Thank you.
~ery t Iy yours, r.!:2~
~~JL~ ..~
seph Ii. Paggi, Jr., .E.
JEP/PJP
cc: Hon. Joseph Ruggiero
Hon. Chris Masterson
Town Board: File
Hon. Graham Foster
Albert P. Roberts, Esq.
Chris Holme
Tatiana Lukianoff
Richard Barger, P.E., L.S.