August 29th, 1984
Mr. Peter Luckel
Luvluk, Inc.
94 Jessen Place
Beacon, NY 12508
RE: Cedar Creek Estates - Final Approval
Dear Mr. Luckel:
At the August 27th, 1984 meeting of the Planning Board, a
motion was made by Mr. Fanuele, seconded by Mr. Keller, to adopt
the following resolution fo final approval:
WHEREAS, an application for final approval of a subdivision plat
entitled "Subdivision Plat for Cedar Creek Estates, Town of Wappinger,
Dutchess County, New York" was received by the Town of Wappinger
Planning Board on May 14th, 1984, and
WHEREAS, a final public hearing was held on said subdivision
application and plat at the Town Hall, Mill street, Wappinger Falls,
New York, on Monday, August 27th, 1984, and
WHEREAS, the requirements of the Subdivision Regulations of the
Town of wappinger have been met by said subdivision plat and application,
except as noted below, and
WHEREAS, the conditions of the preliminary approval of said
subdivision plat, granted by the Town of Wappinger Planning Board on
April 3rd, 1984, have been met, except as noted below.
NOW, THEREFORE, BE IT RESOLVED THAT the application of Peter
Luckel - Luvluk, Inc. for approval of said subdivision plat, prepared
by Richard G. Barger, P.E. & L.S., and dated May 14, 1984, be approved
subject to the following conditions, and that the Chairman be
authorized to endorse approval on said subdivision plat upon compliance
with said conditions by the applicant, which conditional approval
shall expire six months from the date of this resolution if the
applicant has not complied with the conditions set forth.
Upon completion of all requirements set forth in the action
approving the subdivision Plat, the plat shall be properly signed
by the appropriate officers of the Planning Board, and shall be
filed by the applicant in the Office of the County Clerk in accordance
with the requirements of section 278 of the Town Law. Any Subdivision
Plat not SO filed within sixty days of the date of Planning Board
signature shall become null and void.
PLANNI NG BOARD
TOWN OF WAPPINGER
TOWN HALL
WAPPINGERS FALLS. NEW YORK 12580
Ta.. 287.8257
Page -2-
August 29th, '.984
1. Approval of
be obtained on water
approval.
the Dutchess county Department of Health shall
supply and sewage disposal prior to final
2. Curb cut permits shall be obtained from the Town of Wappinger
Highway Superintendent and the Dutchess County Department of Public
Works prior to the issuance of building permits.
3. Approval of the road plan and profile and drainage plan and
profiles shall be obtained from the Engineer to the Town prior to
the signing of the plat. The Conservation Advisory Council shall
be given an opportunity to review these plans prior to the approval
of the Engineer to the Town.
4. Drainage flow patterns shall be indicated on the individual
plot plans. For any surface waters that enter upon properties of
other persons, the applicant shall obtain letters from the same per-
mitting such discharge.
5. The follwoing improvements shall be required.
A. All storm water shall be conveyed by pipe to natural drainage
courses.
B. Standard street signs will be required at each intersection
and temporary signs shall be installed during construction.
c. Street specifications shall be those presently in effect
at the time of start of construction.
D. No open stream will be allowed unless permission in writing
is obtained from the Town of Wappinger Highway Superintendent.
6.
be paid
plat.
Recreation fee of $500.00 per lot on the finrl plat shall
in lieu of a land contribution prior to the signing of the
7. Inspection fees for sewer lines, water lines and storm
drainage lines shallbe paid prior to the signing of the plat.
Certified check is required.
8. Downstream drainage fee of $200.00 per lot on the final
plat shall be paid prior to the signing of the plat.
9. Lowest opening of all houses {windows, doors, garage doors,
crawl space, etc.)shall be at least two feet above the finished
road grade unless waived by the Town of Wappinger Highwas Superin-
tendent and/or Engineer to the Town.
PLANNING BOARD
TOWN OF WAPPINGER
TOWN HALL
WAPPINGERS FALLS. NEW YORK 128"0
Ta.. 287.8287
Page -3-
August 29th, ~984
10. All footing drains and roof leaders shall be piped into the
storm drainage system if specified by the Town of Wappinger Building
Inspector.
1.1. Prior to the issuance of any building permits, a bond of
sufficient amount for the road, drainage and street trees and in a
form approved by the Attorney to the Town shall be approved and
accepted by the Town. Amount of s,id bond is to be determined by
the Highway Superintendent and the Engineer to the Town and shall
be approved by the Town Board.
12. In subdivisions with underground utilities, the developer
shall contact Central Hudson, the New York Telephone, the Town
franchised cable tv company and rhe Town Board to negotiate an
agreement whereby cable tv facilities will be installed with
underground utilities. Should these negotiations be unsuccessful,
the developer or applicant shall provide a statement indicating why
an agreement to provide cable tv service could not be reached prior
to the signing of the plat.
13. The developer will required to keep the roads of the
subdivision clear from snow and ice and make the r03ds passable until
such time as the roads have been accepted by the Town. Upon Failure
to do so, the Town may authorize, after determining that an
emergency exists, a private contractor to clear the roads or make
them passable, and the expense of such work will be assumed by the
developer.
14. Street trees shall be provided in accordance with the
requirements of the Town of Wappinger Subdivision Regulations or
as determined by the Town of Wappinger Planning Board.
15. For each lot an application shall be made for a grading
permit which shall meet the soil Erosion and Sediment Control
ordinance requirements, including submission of a plan showing design
and materials and at least a month by month schedule.
16. Five copies of the filed map shall be required for Planning
Board distribution. Said copies shall be obtained from the County
Clerk's Office.
PLANNING BOARD
TOWN OF WAPPINGER
TOWN HALL
WAPPINGERS FALLS. NEW YORK '2580
T&!.. 287.8257
Page -4-
17. A berm shall be constructed along the property line between
lot 4 and the neighboring property (now or formerly lands of John
Hughes) prior to the issuance of any building permits.
18. A long Enviornmental Assessment Form, Part III, shall be
submitted
Vote:
Mr. Fanuele - aye
Mr. Mills - aye
Mr. May - aye
Mr. Rubenstein - absent
Mr. Keller - aye
Mr. Lawrence - aye
Mr. Parsons - aye
The motion was carried.
Very truly yours,
.~ ulCl ~
Linda Berberich, Secretary
Town of Wappinger Planning
(~.~.lU_l
(' .
l~~
Be ard
Ib
cc: Richard G. Barger, P.E. & L.S.
Dutchess County Department of Health
Dutchess County Department of Public Works
Kenneth Croshier, Highway Superintendent
Fire Prevention Bureau
Hans R. Gunderud, Building Inspector
Pamela M. Farnsworth, ZOning Administrator
Edward Hawksley, Conservation Advisory Council
Ronald Evangelista, Engineer to the Town
Elaine H. Snowden, Town Clerk~