Dugout - Field #1 Change order ~_AIit;:H~TES;7'~-<2 1022 RTE 376 - SUITE 21 WAPPINGERS FALLS, NY 12590 PH: 845-790-0968 Memo Date: August 15, 2011 To: Town of Wappinger Town Board C/O Town Clerk From: Paul S. Pilon, R.A. S&P Architects, P.C. Re: Change Order #1 Dugout - Field #1 - 1st Base line - Robinson Lane Park A change order has been prepared for the above referenced project and a copy is attached to this memo. Separate bids were received from three contractors to construct a new dugout along the first base line at Field #1 at Robinson Lane Park. The apparent low bidder was J. Lyons Contracting. Mr. Lyons' company was told to proceed with the project and recently laid out the proposed dugout on the ground at the site. At that time, representatives from the Town of Wappinger Little League determined that the layout was smaller than the dugout along the third base line and requested that the new one' be made larger to match the existing one along the third base line. Recently, it was determined that the contractors bidding on the project were inadvertently given the wrong drawings. They were given drawings that were prepared for a smaller dugout which was constructed on Field #2 in 2009. Mr. Lyons was asked what the additional cost would be to increase the size of the dugout, based upon the correct set of drawings. His quote to increase the size to 30 feet long by 6 feet 8 inches wide is an additional $2500.00. The Change Order attached was prepared to adjust the contract amount so the new dugout can be constructed in accordance with the correct drawings and to satisfy the needs of the Town of Wappinger Little League. ectfu y Submitted, ~~ . Pilon, R.A. rchitects, P.C. lPd~rc~OW'~[Q) AUG f6 2011 TOWN OF . TOW WAPPINGER N CLERk CC: AI Roberts, Town Attorney Town of Wappinger Supervisor ~/t~CI-I[fli;<;:TS,~. <::; 1022 RTE 376 - SUITE 21 WAPPINGERS FALLS, NY 12590 PH: 845-790-0968 CHANGE ORDER Project: Field #1 - 1 st base line dugout Robinson Lane Park Town of Wappinger, NY Change Order Number: 1 DATE: 08/16/2011 Contractor: J. Lyons Contracting, INC. PO Box 703 Glenham, NY 12527 Original Proposal Date: May 27,2011 The Contract is changed as follows: Increase size of proposed dugout from 24 feet long by 4 feet wide to 30 feet long by 6 '-8" wide as shown on drawings dated Mar 30, 2009 entitled "Proposed Dugout for Town of Wappinger Recreation - Field #1 Robinson Lane" prepared by S&P Architects, P. C. The Original Contract Sum was $ 13.940.00 The net change by previously authorized change orders $ 0.00 The Contract Sum prior to this Change Order was $ 13.940.00 The Contract Sum will be increased by this change order In the amount of $ 2500.00 The new Contract Sum including this change order will be $ 16.440.00 The Contract time will be increased by (0) days. NOT VALID UNTIL SIGNED BY THE ARCHITECT AND OWNER S&P Architects. P.C. Architect 1022 Rte 376 - Suite 21 Wappingers Falls, NY 12590 J. Lyons Contracting Contractor PO Box 703 Glenham, NY 12527 Town of Wappinger Owner 22 Middlebush Rd Wappinger Falls, NY 12590 BY: (signature) Paul S. Pilon, R.A. BY: (signature) James Lyons BY: (signature) Barbara Gutzler, Supervisor Date Date Date May 27,2011 J. Lyons Contracting 10 Old Glenham Road I POB 703 Olenham, NY 12527 845-440..7127 ProDosal for: Becreation Field 2. Robinson l.ane. WaDPingers NY Job: Demolition of existing structure, & installation of new building. We will demolish the existing $tnrcture, & remove all debris on site. The "new dug out" will conelat of all masonry, concrete, carpentry. rQOflng, painting & final grading. All materials and labor a8 per specs and Job description In the plan.. Total costs for this job: $13,940.00 ._It This price does not include rock removal, If n_dad, or any de- watering. That will be if needed considered an extra/change order in the above said price. Thank you for giving our eompany the opportunity to bid with you. J l.yons Contracting 1713/EO 3S1\;ld 5E817 3d01S Sdn 3Hl 55011L5S9178 9p:17I IT0G/9I!80 ,r-~', .' " August 16, 2011 J. Lyons Contracting 10 Old Glenham Road I POB 703 Glenham. NY 12527 845.440~ 7127 ph Town of Wappinger Falls 20 Middlebush Road Wappinger Falls, NY 12590-0324 To the Town of Wappinger Falls: Dear Sir I Madam: Attached please find a copy of the previous estimate re: the dug out, located at #2 Robinson Lane, Wappinger Falls, NY. The previous estimated price reflects a job lotal of $13,940.00. However, due to the increase In the proposed dug out now being 30 ft long, by 6 ft 8 inches wide as shown on drawings entitled "proposed dug out" for the Town of Wappinger Falls Recreation Field #1. Robinson Lane, prepared by S&P Architects. P.C. the additional costs will be $2~OO.OO. Bringing the job total to $16,440.00, which includes all materials and labor, extra roofing, masonry and one pier. Thank you. ~O --- f! Lyons Contracting 00: S&P Architects, P.C. t?f.1 -1-::\ -~L.:,ry,~ t,f8t' :?dG1S Sdrr 3-11 6500L~,8o;,t'8 ~t:P~ TT0~j9T'8Q