2005-03-18 ~ ,- PAGGI,MARTIN &DEL BENE LLP Consulting Engineers & Land Surveyors 56 Main Street Poughkeepsie, New York 12601 845-471-7898 845-471-0905 (FAX) March 16, 2005 Planning Board Town of Wappinger P.O. Box 324 Wappingers Falls, New York 12590 Reference: Proposed Water Storage Tank Chelsea Ridge Apartments RECEIVED MAR 1 8 2005 TOWN CLERK Dear Board Members: On March 14th, 2005 this office received the following information regarding the above referenced project: · Site Plans (Sheets 1 of 5 through 5 of 5) dated February 10th, 2005, as prepared by The Chazen Companies. · Short Environmental Assessment Report (EAF) and Project Narrative. We have reviewed all submittals and would offer the following comments: 1. The Proposal is to install a private Water Storage Facility on the Chelsea Ridge property, for use by the complex. The water supply will be provided by the Village of Fishkill via a proposed water transmission main along Baxtertown Road and Chelsea Road to the complex. Metering facilities will also be installed on Chelsea Ridge property. We have limited our review herein to Site Plan items only. 2. The Project is subject to the technical review and approval of all involved regulatory agencies (Le. NYSDOH, DCHD, DCDPW, NYSDOT, Village of Fishkill, etc.). Construction inspection, testing and Completed Works certification shall be performed by the Applicant's Engineer. We would ask that our office be copied on all future submissions. 3. We would ask that the Plans be revised at the complex entrance on Chelsea Road to allow for a potential future extension of the mains into the hamlet of Chelsea. In lieu of the 2 - 450 bends into the complex driveway, we would ask that an 8"x8"x8" tee be installed, with a dead end stub and 8" gate valve heading westerly along the north side of Chelsea Road. 4. The Water Storage Tank is proposed to be 46' x 56' concrete structure, 16' high, but with 10':t buried underground (Le. 6':t net above finished grade). The exterior will be an exposed concrete finish, with a standing seam metal roof. All elevations, colors, materials, etc. are subject to the review and approval of the Planning Board. Joseph E. Paggi, Jr., P.E. Ernst Martin, Jr., P.E., L.S. Charles R. Del Bene, Jr., P.E. ~. .1Ia Planning Board RE: Chelsea Ridge Water Tank -2- March 16, 2005 5. All aesthetic impacts must be mitigated to the satisfaction of the Town Planner. All proposed fencing, landscape screening, etc. is subject to the review and approval of the Town Planner. Please feel free to contact this office if you have any questions regarding this matter. Thank you. JEP/PJP:law cc: Hon. Joseph Ruggiero Hon. Gloria Morse Town Board: File Hon. Graham Foster Daniel Wery, AICP Albert P. Roberts, Esq. Tatiana Lukianoff Mark Liebermann Richard Chazen, P.E.