Loading...
2012-233 2012-233 Public Interest Order in the Matter of the Increase and Improvement of the Facilities of the United Wappinger Sewer District in the Town of Wappinger, Dutchess County, New York At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on September 10,2012. The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers Barbara Gutzler William H. Beale Vincent F. Bettina Ismay Czarniecki Michael Kuzmicz ABSENT: The following Resolution was introduced by Councilwoman Czarniecki and seconded by Councilman Kuzmicz. WHEREAS, the Town Board of the Town of Wappinger, Dutchess County, New York has duly caused to be prepared a map, plan and report including an estimate of cost, pursuant to Section 202-b of the Town Law, relating to the proposed increase and improvement of the facilities of the United Wappinger Sewer District, in the Town of Wappinger, Dutchess County, New York, (the "Sewer District") consisting of the purchase and installation of approximately 800 linear feet of 8" gravity sewer line along with manholes from the existing sewer line by the Roberts Road Pump Station to the existing sewer line located at Rosewood Court in said Sewer District, including land or rights-in-Iand, original furnishings, equipment, apparatus, appurtenances, and incidental improvements and expenses in connection therewith, at a maximum estimated cost of $256,000; and WHEREAS, at a meeting of said Town Board duly called and held on August 13,2012, an Order was duly adopted by it and entered in the minutes specifying the said Town Board would meet to consider the increase and improvement of the facilities of the United Wappinger Sewer District, in said Town at a maximum estimated cost of $256,000, and to hear all persons interested in the subject thereof concerning the same at the Town Hall, in Wappingers Falls, New York, in said Town, on September 10,2012 at 7:30 o'clock P.M., Prevailing Time; and WHEREAS, said Order duly certified by the Town Clerk was duly published and posted as required by law; and WHEREAS, a public hearing was duly held at the time and place set forth in said notice, at which all persons desiring to be heard were duly heard; NOW, THEREFORE, BE IT ORDERED, by the Town Board of the Town of Wappinger, Dutchess County, New York, as follows: Section 1. Upon the evidence given at the aforesaid public hearing, it is hereby found and determined that it is in the public interest to make the increase and improvement of the facilities of the United Wappinger Sewer District, in the Town of Wappinger, Dutchess County, New York, consisting of the purchase and installation of approximately 800 linear feet of 8" gravity sewer line along with manholes from the existing sewer line by the Roberts Road Pump Station to the existing sewer line located at Rosewood Court in said Sewer District, including land or rights-in-land, original furnishings, equipment, apparatus, appurtenances, and incidental improvements and expenses in connection therewith, at a maximum estimated cost of $256,000 Section 2. This Order shall take effect immediately. The foregoing was put to a vote which resulted as follows: BARBARA GUTZLER, SUPERVISOR WILLIAM H. BEALE, COUNCILMAN VINCENT F. BETTINA, COUNCILMAN ISMA Y CZARNIECKI, COUNCIL WOMAN MICHAEL KUZMICZ, COUNCILMAN Voting: Voting: Voting: Voting: Voting: AYE AYE AYE AYE AYE Dated: Wappingers Falls, New York 9110/2012 The Resolution is hereby duly declared adopted. f:~~LERK