Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Addendum
Senrt By: MORRIS ASSOCIATES; G3C~C~(~Q~I~D JAN 17 2013 TOWN 01= WAPPINGER TO!lI~N CLERK January 17, 2013 NOTE: This Addendum farms a part of the contract documents. Acknowledge receipt of this addendum in the appropriate location on the bid, GENERAL The following addendum including changes., addi#ions andlor deletions are hereby made a part of this contract. PLANS C~rawing MD-3, Typical Water Service Connection to Water Maim Delete Note 2 ahd Insert: °SERV#GE SADDLES ARE REQUIRED FOR SERVICE CONNECTIONS 1" DIAMETER aND LARGER." Delete Note 3 and insert: "SERVICE SAD©LES SHALL BE SINGLE 4R DOUBLE STRAP BRONZE NYLnN COATED OR STAINLESS STEEL WITH RUSSER GASKETS RATED AT A MINIMUM tDP 280 PSI AND SHALL CONFORM TO ANSI/AWWA C=800 STANDARDS". SPECIFICATIONS Division 100, 5!ecttQn A.6 Delete "!'ive (5} working days" aryl Insert "five (5) calendar days" Section 00800 -Special Conditions 1.15 Measurement and Paymergt: Item Na. 2 Water Main, Temporary Pavement The scope of work for temporaryF pavement shall be as follows: Temporary pavemenrt will be required far all trenches (main and services) that cross or are within the roadway. Temporary pavement must be' installed by the end of work on the closest Friday following installation of pipe in ttie affected trenches. Gn Wheeter Hill Road, temporary pavement will consist of 3" of d~rise binder (NYSDOT 403.13} Installed flush with existing grade. ~if the walk is performed when blacktop plants are closed, 3" of cold patch may be used. Coid patch must be removed and replaced with binder prior to installing the pavement overlay. ~ If settlement does not occur and the condition of the temporary binder is acceptable to the Highway Superintendent,,the overlay can be placed overthe~temporary pavemen#. If settlement-occurs or the binder is not considered to be in an acceptable condition, it must be removed and replaced with binder per the typical Town Roa~;Trench Detai! on sheet MD-4. Qn River Road, temporary pavement will consist of 1-1/2" of dense binder, or cold patch installed flush with existing grade. The binder ar,cald patch will be removed prior to final trench restore#ion per fhe Town Road Trench Detail on sheet MD-4, 8454731962; Jan-17-13 3:18PM;~ Page 2/2 7NSTRUCTipN BID ANC? CONTRACT F4R WATER MAIN EXTENSION TC~ NYCDEP TOWN OF WAPPINGER Page 1 of 1 E~SdocumentslT Waevinabrla W20121W212~~5 NYCDEP ExtenelonlSubmissions ~ Apprava{s1ADQ2_Q'17713.doc