2013-1092013-109 Resolution Authorizing Change Order No.l for Little League Challenger Field Project Funded by Community Development Block Grant At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on March 25, 2013. The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers ABSENT: Barbara Gutzler William H. Beale Vincent F. Bettina Ismay Czazniecki Michael Kuzinicz The following Resolution was introduced by Councilman Kuzmicz and seconded by Councilman Bettina. WHEREAS, by Resolution adopted by the Town Board on October 22, 2012, the Town Board awarded a bid to Sun Up Enterprises, Inc. in the amount of $78,275.00 for the construction and installation of handicapped accessible improvements at the Challenger Fields at the Robinson Lane Sports Complex; and WHEREAS, Greg W. Bolner, P.E. of Clark Patterson Lee Design Professionals, Engineer for the Town for this project, has requested Change Order No. 1 to the Contract as per letter dated March 15, 2013. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth aze incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby approves Change Order No. 1 in the amount of One Thousand Four Hundred Dollars ($1,400.00), dated March 14, 2013 for the Little League Challenger Field project between the Town of Wappinger and Sun Up Enterprises, Inc. resulting in a revised Contract sum in the amount of Seventy Nine Thousand Six Hundred Seventy-Five Dollazs ($79,675.00) for the reasons and associated costs set forth in a letter dated March 15, 2013 from Greg W. Bolner, P.E. of Clark Lee Patterson Design Professionals, a copy of which is affixed hereto. The foregoing was put to a vote which resulted as follows: BARBARA GUTZLER, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE MICHAEL KUZMICZ, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 3/25/2013 The Resolution is hereby duly declared adopted. CHRISTINE FULTON, TOWN CLERK Change Order No.1 Date of Issuaace: March 94, 2093 Effective Date: Date of signature by Owner Project: CDi3G -Little League Owner: Town of Wappinger Ownet~s Contract No.: Challenger Field __ Contract: Handicap Accessible Challenger Fief Contractor. Sunup Enterprises, )nc. of Contract: Project Aio.:11a12.07 The Contract Documents are modified as follows upon ezecutlon of this Change Order: Description: 1) Fum~tt an additional 200 square feet of asphalt pad 6t the area as shown on the attached sketch and per the asphalt sidewalk/pad detaq on the origins! bld plan set. Attachments (list documents suppor#ing change): None G'HANGE IN CONTRACT PRICE: CHANGE llY CONTRACT TIMES: Original Contract Price: Original Contract Times: ^ Working days ^ Caleadar days $78,275.00 ~J [J i~om previously approved [Irtcreasej ] from previously approved Change Orders Chaage Orders No. Q; No. Q to No. 0• Substantial completion (days or date): $4.00 Contract Price prior to this Change Order: X78.275.00 Increase of this Change Order: X9.400.00 Contract Times prior to this Change Order: {lncreaseJ (Decrease] of this Change Order: Ctu~ract Price incorporating this Change Order: Contract Times with all approved Change Orders: $79.675.00 Enguteer Si ttue) Oiveer (Authorised SignaNre) Date: Date: Approved by Funding Agency {if applicable): B3'~ Siguattue} Date: Date: mcnc c sii ceaa~ oar Prepared by toe Eogiocers 3otat Contract Docnmeats Committee and tDdor~d by 6u Comtrnetbm Specificatrons Iastftute. Page 1 or t .~~ Mazch 15, 2013 Supervisor Bazbaza Gutzler and Members of the Town Board Town of Wappinger 20 Middlebush Road Wappingers Falls, NY 12590 Re: Tawn of Wappinger CDBG -Little League Challenger Field Additional Asphalt Area Dear Supervisor Gutzler and Members of the Town Boazd: Clark Patterson Lee DESIGN PROFESSIONALS As a result of the conceptual change in plan from a restroom building to a trailer mounted portable handicap accessible restroom, it is recommended that the Town provide a paved area for the placement of the trailer. With the current contract with Sunup includes paving of the asphalt walkways and pads and asphalt pazking area, it is recommended that the Town issue a change order to Sunup to provide the additional pavement area of 200 squaze feet. Attached is a change order request form which outlines the financial changes to the contract. There are sufficient funds in the Town's current grant to cover the additional cost of $1,400. If you have any questions, please contact me at 845-567-2011 ext. 2119. Sincerely, Clark Patterson Lee Greg W. Bolner, P.E. Principal Associate cc: Albert P. Roberts, Esq., Town Attorney Ralph Holt, Recreation Committee Chairman ~(J~Gca€:~~r~*~; f~:~~utt~~a;~ ~,lar ,fir' ~ ':O€t C"` i~s~ ~~~ v .c ,... FENCE W/ CAPP/NG NEW 6' CHA/N LINK FENCE W/ CAPPING. S`ET IN CONC CURB 'HALT PAD, 6' CHAIN ~, NEW 21 ' 'ERMANENT). 0 v ,,, ~,, ,; ~ ~~ ~~~ ,_ ,. - __ ,; HM ,% ~ ,~ y Q. i; 6 C SLEI/ES 8" AND 5' ~W GRADE ~ ~ ~ lj'' a I I R 10' ~j' i i ya- r / /~ . R1o~~ \, ~~ ~~~~~ ;~~ ~4 -NEW ~ r D, NEW 6' ~ - t FENCE r~ r 7-f 4BLE BLEACHERS, TYP. ~/1~E0 BY OWNER) s ~~ e 4`~