Resolution Authorizing Change in Scope of Work to be Performed by Greg W. Bolner, the
Engineer for the Town for Little League Challenger Field Project Funded by Community
Development Block Grant
At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County,
New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on Apri122,
2013.
The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being
called, the following were present:
PRESENT: Supervisor
Councilmembers
ABSENT:
Barbara Gutzler
William H. Beale
Vincent F. Bettina
Ismay Czarniecki
Michael Kuzmicz
The following Resolution was introduced by Councilman Bettina and seconded by
Councilman Kuzmicz.
WHEREAS, by resolution dated January 7, 2013, the Town Board authorized the
retention of Greg W. Bolner, P.E. of Clark Patterson Lee Design Professionals, to provide
professional engineering services for the purpose of the completion of the Robinson Lane
Challenger Field, in accordance with the RFP he submitted dated May 23, 2012; and
WHEREAS, Greg W. Bolner, P.E. has requested a change in the scope of the work his
firm is to perform on this project as per letter dated March 29, 2013, due to the change from a
modular building to house restroom facilities to atrailer-mounted restroom facility; and
WHEREAS, pursuant to the March 29, 2013 letter, the proposed change is expected to
result in a savings to the Town of two thousand dollars ($2,000.00).
NOW, THEREFORE, BE IT RESOLVED, as follows:
1. The recitations above set forth are incorporated in this Resolution as if fully set
forth and adopted herein.
2. The Town Board hereby approves the change in scope of the work to be
performed by Greg W. Bolner, P.E. of Clark Patterson Lee Design Professionals
for the Little League Challenger Field project between the Town of Wappinger
and Sun Up Enterprises, Inc. for the reasons and associated costs and credits set
forth in a letter dated March 29, 2013 from Greg W. Bolner, P.E. of Clark Lee
Patterson Design Professionals, a copy of which is affixed hereto.
The foregoing was put to a vote which resulted as follows:
BARBARA GUTZLER, SUPERVISOR Voting: AYE
WILLIAM H. BEALE, COUNCILMAN Voting: AYE
VINCENT F. BETTINA, COUNCILMAN Voting: AYE
ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE
MICHAEL KUZMICZ, COUNCILMAN Voting: AYE
Dated: Wappingers Falls, New York
4/22/2013
The Resolution is hereby duly declared adopted.
CHRISTINE FULTO ,TOWN CLERK
.. - .~
_ .-
March 29, 2013
Supervisor Barbara Gutzler and
Members ofthe Town Board .
Town of Wappinger
20 Middlebush Road
Wappingers Falls, New York 12590
Clark Patterson Lee
DESIGN PROFESSIONALS
Re: Fee Proposal for Engineering Services for Town of Wappinger
Little League Field at Robinson Lane Recreation Com lex
Dear Supervisor Guzzler and Members of the Board:
Clark Patterson Lee is proposing a change in scope for re ' ' es proposed for the Wappinger
Challenger Field. The original scope of work anticipated a modular restroom building to be placed at the
field and connected to water and electric with a holding tank. Based on research we have conducted and
discussions with the Town Board and the Recreation Committee, the scope has changed from a modular
building to a Trailer mounted restroom facility. Subsequentto these discussions, the grant application for
the current year was modified to incorporate the trailer mounted restroom facility into the design.
As a result of this change in scope, DOH approval is no longer required as a part of our scope. This
results in a credit to the Town of $4,000. The original scope of work included plans and specifications for
a modular building which is similar in scope to that for a trailer mounted restroom facility which we have
begun developing as discussed above. The original scope of work did not however include the
solicitation of bids for the restroom facility as a separate phase as this was not funded at the time of our
original proposal. We are also recommending that we solicit quotes from the contractor as a
consideration of a change order to install the electrical connection for the trailer.
2012 Grant Application Phase
• DOH Approvals (credit) ($4,000)
2013 Grant Application Phase
Solicitation of Bids & Submittal Review $1,500
Change Order Process $ 500
Total ($2,000)
If an acceptable is not negotiable, solicitation of bids for the electrical connection is anticipated to be
$2,000, which would then make this a no cost change in scope.