2013-1282013-128 Resolution Authorizing Change in Scope of Work to be Performed by Greg W. Bolner, the Engineer for the Town for Little League Challenger Field Project Funded by Community Development Block Grant At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on Apri122, 2013. The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers ABSENT: Barbara Gutzler William H. Beale Vincent F. Bettina Ismay Czarniecki Michael Kuzmicz The following Resolution was introduced by Councilman Bettina and seconded by Councilman Kuzmicz. WHEREAS, by resolution dated January 7, 2013, the Town Board authorized the retention of Greg W. Bolner, P.E. of Clark Patterson Lee Design Professionals, to provide professional engineering services for the purpose of the completion of the Robinson Lane Challenger Field, in accordance with the RFP he submitted dated May 23, 2012; and WHEREAS, Greg W. Bolner, P.E. has requested a change in the scope of the work his firm is to perform on this project as per letter dated March 29, 2013, due to the change from a modular building to house restroom facilities to atrailer-mounted restroom facility; and WHEREAS, pursuant to the March 29, 2013 letter, the proposed change is expected to result in a savings to the Town of two thousand dollars ($2,000.00). NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby approves the change in scope of the work to be performed by Greg W. Bolner, P.E. of Clark Patterson Lee Design Professionals for the Little League Challenger Field project between the Town of Wappinger and Sun Up Enterprises, Inc. for the reasons and associated costs and credits set forth in a letter dated March 29, 2013 from Greg W. Bolner, P.E. of Clark Lee Patterson Design Professionals, a copy of which is affixed hereto. The foregoing was put to a vote which resulted as follows: BARBARA GUTZLER, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE MICHAEL KUZMICZ, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 4/22/2013 The Resolution is hereby duly declared adopted. CHRISTINE FULTO ,TOWN CLERK .. - .~ _ .- March 29, 2013 Supervisor Barbara Gutzler and Members ofthe Town Board . Town of Wappinger 20 Middlebush Road Wappingers Falls, New York 12590 Clark Patterson Lee DESIGN PROFESSIONALS Re: Fee Proposal for Engineering Services for Town of Wappinger Little League Field at Robinson Lane Recreation Com lex Dear Supervisor Guzzler and Members of the Board: Clark Patterson Lee is proposing a change in scope for re ' ' es proposed for the Wappinger Challenger Field. The original scope of work anticipated a modular restroom building to be placed at the field and connected to water and electric with a holding tank. Based on research we have conducted and discussions with the Town Board and the Recreation Committee, the scope has changed from a modular building to a Trailer mounted restroom facility. Subsequentto these discussions, the grant application for the current year was modified to incorporate the trailer mounted restroom facility into the design. As a result of this change in scope, DOH approval is no longer required as a part of our scope. This results in a credit to the Town of $4,000. The original scope of work included plans and specifications for a modular building which is similar in scope to that for a trailer mounted restroom facility which we have begun developing as discussed above. The original scope of work did not however include the solicitation of bids for the restroom facility as a separate phase as this was not funded at the time of our original proposal. We are also recommending that we solicit quotes from the contractor as a consideration of a change order to install the electrical connection for the trailer. 2012 Grant Application Phase • DOH Approvals (credit) ($4,000) 2013 Grant Application Phase Solicitation of Bids & Submittal Review $1,500 Change Order Process $ 500 Total ($2,000) If an acceptable is not negotiable, solicitation of bids for the electrical connection is anticipated to be $2,000, which would then make this a no cost change in scope. Clark Patterson Lee GregJG~olner, P.E. Principal Associate 900 Corporate Boulevard Newburgh, NY 12550 clarkpatterson.com 800.274.9000 rEL 845.567.9614 Fax