2013-2242013-224 Resolution Authorizing Change Order No. 1 For Martz Field East Tennis Court Reconstruction At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on October 15, 2013. The meeting was called to order by Barbara Gutzler, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers ABSENT: Barbara Gutzler William H. Beale Vincent F. Bettina Ismay Czarniecki Michael Kuzmicz The following Resolution was introduced by Councilman Kuzmicz and seconded by Councilman Bettina. WHEREAS, by Resolution No. 2013-185, adopted by the Town Board on August 5, 2013, the Town Board awarded a bid to Avello Brothers Contractors, Inc. in the amount of $125,725.00 for the reconstruction of the Martz Field East Tennis Court; and WHEREAS, Robert J. Gray, P.E. of Morris Associates Engineering Consultants, PLLC, Engineer to the Town, has requested Change Order No. 1 to the Contract as per letter dated September 23, 2013; and WHEREAS, the proposed Change Order was discussed at the regularly scheduled Town Board meeting on September 23, 2013 at which time the Town Board adopted a motion to pay Avello Brothers Contractors, Inc. the sum of Three Thousand Three Hundred Twenty-Four Dollars ($3,324.00) as per proposed Change Order and this Resolution is adopted to formally ratify said motion. NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby approves Change Order No. 1 in the amount of Three Thousand Three Hundred Twenty-Four Dollars ($3,324.00), dated September 23, 2013 for the Martz Field East Tennis Court Reconstruction project between the Town of Wappinger and Avello Brothers Contractors, Inc. resulting in a revised Contract sum in the amount of One Hundred Twenty-Nine Thousand Forty-Nine Dollars ($129,049.00) for the reasons and associated costs set forth in a letter dated September 23, 2013 from Robert J. Gray, P.E. of Morris Associates Engineering Consultants, PLLC, a copy of which is affixed hereto. The foregoing was put to a vote which resulted as follows: BARBARA GUTZLER, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE MICHAEL KUZMICZ, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 10/15/2013 The Resolution is hereby dul declared adopted. f, ~ ~ CL MIC EL J. L ,TOWN CLERK 9~F/,3 MORRIS ASSQCIATES ENGINEERING CONSULTANTS, PLLC 9`Elks Cane, Poughkeepsie, New York 12601 Tet: (845} 454-34.11 Fax: (845} 473-1.962 ^ fi4 Green. Street, Suite'1, Hudson, New York 12534 Tel: (518} 82&2300 Fax: (518} $28-3963 September 23, 2013 Town. of Wappinger Town Board Town Kall ZO Middlebush Road Wappingers Falfs, NY 12590 Attn: Hon. Barbara Gutzler, Supervisor RE: Martz Field East Tennis Court Replacement Project Change a.rder #1 MA#W2130S Dear Supervisor Gutzler and Town Board .Members: During the reconstruction of Martz Field tennis. courts, it was discovered that the Practice Board that was planned. to be reutilized was discovered to t}e in poor condition: and could not be reused. Anew Practice Board will have to be constructed at a cost of $3,324. As such, this change will result in the contract amount going from $125,725 to $129,049. This change to the contract requires Town Board approval. I attach a Chartge Order Form outlining the change. If you have any questions, please call me at (914} 475-5749... Very. Truly yours, ASSOCIATES na Consultants Robert J. Gray, P Engineer to the T w of Cc .Albert Roberfs, Town Attamey Jessica Fulton, Deputy Town'Clark AvelEo Brothers Contractors, Inc. E:~documentslT wappingerla W2013tW21305 Martz Tennis Rehab East\Change Order _1 9-23-131.docx CHANGE ORDER PROJECT: CHANGE ORDER NUMBER: 1 TOWN OF WAPPINGER DATE: September 23, 2013 MARTZ FIELD EAST TENNIS COURT RECONSTRUCTION PROJECT Contract # 13-013 TO CONTRACTOR: ENGINEERS PROJECT NO.: W20840.00 Brothers Contractors Inc ll A . ve o 60 Fulton Street CONTRACT DATE: August 22, 2013 Poughkeepsie, NY 12601 CONTRACT FOR: 845-454-3650 Tennis Court Reconstruction The Contract is changed as follows: Re-construction of a new Practice Board. Cost for the new Practice Board is $3,324.00. The final contract sum is considered full and final payment for all labor, equipment, materials and services required by the work. NOT VALID UNTIL SIGNED BY THE OWNER, ENGINEER AND CONTRACTOR. The original Contract Sum was .......................................................................................... $ 125,725.00 Net change by previously authorized Change Orders ..................................................... $ 0.00 The Contract Sum prior to this Change Order was ........................................................... $ 125,725.00 The Contract Sum will be increased by this Change Order in the amount of ...................... $ 3,324.00 The new Contract Sum including this Change Order will be ................................................ $ 129,049.00 ENGINEER CONTRACTOR OWNER Morris Associates Avello Brothers Town of Wa finger ADDRESS ADDRESS ADDRESS 9 Elks Lane 60 Fulton Street Town Hall Poughkeepsie, NY 12601 Poughkeepsie, NY 12601 20 Middle Bush Road Wappingers Falls, NY 12590 BY: BY: BY: ti-. DAT DATE: DATE: ~Z, l