Rohde,Soyka&AndrewsROHDE, SoYKA 40 Garden Street
~ & ANDREWS Poughkeepsie, NY 12601
Consulting Engineers, P.C. Phone: (845) 452-7515 Fax: (845) 452-8335
E-Mail Address: info@rsaengrs.com
Wilfred A. Rohde, P.E • Michael W. Soyka, P.E • John V. Andrews, Jr., P.E
TOWN OF WAPPINGER PLANNING BOARD
2012 FEE SCHEDULE
For all work done on a time and material basis, the following Fee Schedule shall apply:
Principal Engineer $125.00 per hour
Wilfred A. Rohde, P.E.
John V. Andrews, Jr., P.E.
Principal Engineer -Active Retired $115.00 per hour
Michael W. Soyka, P.E.
Licensed Engineer 115.00 per hour
Julie S. Mangarillo, P.E., CPESC
Staff Engineer 90.00 per hour
Senior Designer 85.00 per hour
Senior CADD Operator 85.00 per hour
CADD Operator 75.00 per hour
Designer 75.00 per hour
Contract Specialist /Administrative Assistant 60.00 per hour
Susan E. Naglieri
Mileage 0.60 per mile
Copies
Black & White 0.25 per copy
Color 1.00 per copy
Bond Plots
Black & White 0.45 per square foot
Color 0.75 per square foot
Expenses & Special Services Cost plus 15%
Outside Consultant Fees Cost plus 20%
This Schedule is in effect from January 1, 2012 through December 31, 2012
ROHDE, SOYKA 40 Garden Street
& ANDREWS Poughkeepsie, NY 12601
Consulting Engineers, P.C. Phone: (845) 452-7515 Fax: (845) 452-8335
E-Mail Address: info@rsaengrs.com
Wilfred A. Rohde, P.E • Michael W. Soyka, P.E • John Y. Andrews, Jr., P.E.
November 10, 2011
Planning Board
Town of Wappinger
20 Middlebush Road
Wappingers Falls, NY 12590
Attn: Victor L. Fanuele, Chairman
RE: Professional Services -Civil Engineering
Town of Wappinger Planning Board
Dear Chairman Fanuele and Members of the Planning Board:
Rohde, Soyka & Andrews Consulting Engineers, P.C. (RSA) is pleased to submit this proposal for Civil
Engineering Services to the Town of Wappinger Planning Board in response to your Request for Proposal
dated October 4, 2011.
RSA currently provides services to the Town of Fishkill Planning Board, a position we have held since
1992; the Town of Kent Planning Board, a position we have held since 1997 and we provide special
project assistance on an as-needed basis to the Planning Boards of the Town of Amenia and the Town of
Lloyd in Ulster County. In the past, we have provided civil engineering services to the Town of Beekman
Planning Board from January 2002 to the end of December 2009; and from time to time to the Town of
LaGrange Planning Board in the event of a conflict on the part of their customary engineer. We believe,
based on these positions, that we have the experience, skill, practical and technical knowledge necessary
to provide the Town of Wappinger Planning Board with the civil engineering services you are seeking.
1.0 SCOPE OF WORK
Pursuant to your Request for Proposal, the services to be provided to the Planning Board
specifically include, but may not necessarily be limited to, studying and reporting on all proposed
development matters (for example subdivisions, site plans, special use permits and other normal
planning matters); site visits as necessary and; attendance at two (2) evening Planning Board
meetings per month. We are able and prepared to provide these required basic services as
described.
Each Planning Board that we have worked with has had its own unique way of utilizing its
professional consultants. Each Planning Board has clearly established expectations with respect
Page 1 of 6
Planning Board
Town of Wappinger
November 10, 2011
Page 2 of 6
to the performance of their consultants. The manner and method by which services are provided
to the various Planning Boards has been established by those Boards during the initial stages of
the engagement.
It is our experience that the technical aspects of the position, particularly coordination with the
Planning Board Secretary and the other consultants employed by the Board; the format and
distribution of comment memos and reports; and the participation level of the consultant in Board
discussions and site visit are generally easily worked out. Understanding the policies, practices,
procedures and requirements of the Board itself tend to take longer and generally evolve over
time depending upon the character of the Board and of the consultant.
We have come to realize, given our experience over time with differing Planning Boards, that it is
our responsibility as the consultant to tailor our schedule for the completion of assigned tasks to
the schedule of the Planning Board. The regular and routine Planning Board meeting schedule
establishes targets and milestones. As the consultant it is essential that we maintain the flexibility
to satisfy the requirements of the Board in moving projects toward completion. We believe that a
thorough initial review of any project with the identification of all pertinent issues in the early
stages of development is the key to maintaining a good project review schedule. Following that
initial review, it is important to maintain open lines of communication and coordination with
other consultants, Town staff and the Board itself in order to maintain a workable project
schedule. We realize that there are a wide variety of factors that go into reviewing a project
efficiently. We believe that that the quality of the submittal made on behalf of a given project is
the single most important element in moving a project forward. The responsibility for such a
submittal falls on the Project Sponsor but it is incumbent on us as the consultant to the Town to
identify, describe and maintain a consistent approach to deficiencies in those initial submittals.
It is our custom and practice to prepare and submit written reports and/or comment memos for
any and all assigned work associated with projects in front of the Planning Board. All such
reports or comment memos will be signed by the individual responsible for their content. In
discussion of such items with the Board we believe it is imperative that the individual preparing
the report or comment memo be available to the Board and the Project Sponsor for discussions.
The written comment memorandum covering each submittal typically address compliance with
the technical aspects of appropriate Town Code sections, the Town Comprehensive Plan and the
identified priorities, procedures and standards of the Town of Wappinger and general engineering
custom and practice. Subsequent reviews would document compliance with or satisfaction of
previous comments and include new comments occasioned by the current submittal. We believe
it to be important that consistency be maintained in the review of submitted projects.
We prefer that all our work be properly coordinated through the Planning Board. In our
experience direct involvement by us with the Project Sponsor should be avoided unless
specifically authorized by the Planning Board in advance. Meetings with the Project Sponsor
ROIiDE, SOVxA BL ANDREWS CONSULTING ENGINEERS, P.C.
Planning Board
Town of Wappinger
November 10, 2011
Page 3 of 6
should only occur when authorized by the Planning Board and should, whenever possible, be
attended by appropriate members of the Town staff and/or other members of the consultant team.
All meetings are documented in written form with copies submitted to the Planning Board and all
attendees.
In our experience, when changing consultants, it is important that a proper transition occur.
Submittals for existing projects currently before the Board and previously reviewed by other
consultants need to be handled in a manner which minimizes inconvenience to the Planning
Board and the Project Sponsor, maintains the project schedule and controls the additional cost
that may result from the transition. In our experience it becomes important for us as the new
consultant to familiarize ourselves with the current status of a given project and the contents of
prior review memorandum and/or reports. Going forward, it is imperative that we address and
document completion or satisfaction of prior comments and prepare new comments without
revisiting closed issues.
2.0 POINT OF CONTACT
The Principal Engineer and point of contact for the Town of Wappinger Planning Board will be
John V. Andrews, Jr., P.E. It is likely that Julie S. Mangarillo, P.E., CPESC will play a major
role and participate extensively in the review of projects before the Board and may on occasion
attend Planning Board meetings with or in lieu of Mr. Andrews. Administrative and billing
matters will be handled by Susan E. Naglieri. From time to time it may be necessary to utilize
other RSA personnel to provide services for the engagement.
3.0 DISCLOSURE
Rohde, Soyka & Andrews Consulting Engineers, P.C. does not have any active or ongoing
projects within the Town of Wappinger and/or before any Town of Wappinger Board or
department. There may be situations where our work as the Engineer to the Town of Fishkill
Planning Board involves projects which straddle the Town of Fishkill or the Town of Wappinger
town line.
If we are selected to provide services to the Town of Wappinger Planning Board, it is our
Company policy and we affirmatively state for the record that we will not accept or pursue any
private projects within the Town of Wappinger and/or any projects which may require approval
or permit from a Town of Wappinger Board or department for the period of time that we are
employed as a consultant to the Town of Wappinger Planning Board.
ROHDE, SOYKA 8L ANDREWS CONSULTING ENGINEERS, P.C.
Planning Board
Town of Wappinger
November 10, 2011
Page 4 of 6
4.0 TERM OF THE AGREEMENT
The term of this agreement will be to December 31, 2012. The Town of Wappinger Planning
Board has the option to exercise up to two (2) annual renewals.
We understand the Town maintains the right to terminate any agreement without cause by
specifying the date of termination in a written notice to the firm at least sixty (60) days before the
termination date. In the event of any termination, RSA will be entitled to reasonable and equitable
compensation for all satisfactory services rendered.
5.0 BASIS OF SERVICES
All services will be performed on a time and material basis in accordance with Attachment A,
2012 Fee Schedule (enclosed herewith under separate sealed cover), unless otherwise agreed to
prior to the commencement of work.
RSA reserves the right to annually adjust the fee schedule for services rendered, providing that
the adjustment does not exceed the annual consumer price index increase and, further, that written
notice is provided to the Town no later than September 15`" of the year preceding the anticipated
rate adjustment.
For services funded through a Town Escrow process, RSA reserves the right to suspend work on
any project for which no payment is received within forty-five (45) days of billing due to escrow
depletion. RSA expects the Town to honor this position and to suspend action on any project for
which non payment occurs.
6.0 REUSE OF DOCUMENTS -CONTRACT FORM EXCEPTION
All documents including Drawings and Specifications prepared or furnished by RSA (and the
Engineer's independent professional associates and consultants) pursuant to this Agreement are
instruments of service in respect to the Project, and the Engineer shall retain any ownership and
property interest therein whether or not the Project is completed. The Owner may make and
retain copies for information and reference in connection with the use and occupancy of the
project by the Owner and others; however, such documents are not intended or represented to be
suitable for reuse by the Owner or others on extension of the Project or on any other project. Any
reuse without written verification or adaption by the Engineer for the specific purpose intended
will be at the Owner's sole risk and without liability or legal exposure to the Engineer, or the
Engineer's independent professional associates or consultants, and the Owner shall indemnify and
hold harmless the Engineer and the Engineer's independent professional associates and
consultants from all claims, damages, losses and expenses, including attorneys' fees, arising out
of or resulting therefrom. Any such verification or adaptation will entitle the Engineer to further
compensation at rates to be agreed upon by the Owner and the Engineer.
ROHDE, SOYKA BG ANDREWS CONSULTING ENGINEERS, P.C.
Planning Board
Town of Wappinger
November 10, 2011
Page 5 of 6
7.0 PAYMENT FOR TRAVEL -CONTRACT FORM EXCEPTION
Payment for travel time and reimbursement for miles driven is standard for the consulting
business. RSA proposes that mileage and travel time be subject to reimbursement for attendance
at Planning Board meetings and scheduled site visits. These charges will be apportioned to each
project up for review at the Planning Board meeting and reimbursed to RSA from the escrow
account.
RSA also proposes that travel time and mileage for meetings with Project Sponsors and/or Town
officials, outside of Planning Board meetings, be subject to reimbursement. These charges will
also be apportioned to the project which is the subject of the meeting and reimbursed to RSA
from the escrow account.
8.0 OPINIONS OF COST
Since RSA has no control over the cost of labor, materials, equipment or services furnished by
others, or over the Contractor(s)' methods of determining prices, or over competitive bidding or
market conditions, the Engineer's opinions of probable Total Project Costs and Construction Cost
provided for herein are to be made on the basis of the Engineer's experience and qualifications
and represent the Engineer's best judgment as an experienced and qualified professional engineer,
familiar with the construction industry, but the Engineer cannot and does not guarantee that
proposals, bids or actual Total Project or Construction Costs will not vary from opinions of
probable cost prepared by the Engineer.
9.0 CONTROLLING LAW
This Agreement is to be governed by the law of the principal place of business of RSA.
10.0 BILLING AND PAYMENT
Bills will be rendered at the end of each month and are due upon receipt. Bills will be itemized
by personnel and expenses. Each bill will contain a description of the work done during the
billing period. A sample municipal invoice is attached hereto for your information.
11.0 INSURANCE
RSA carries both General and Professional Liability Insurance. Sample Certificates of Insurance
are attached herewith for your review. RSA is prepared to provide appropriate Certificates of
Insurance to the Town of Wappinger when requested.
ROHDE, SOYKA BC ANDREWS CONSULTING ENGINEERS, P.C.
Planning Board
Town of Wappinger
November 10, 2011
Page 6 of 6
12.0 ATTACHMENTS
- Detailed Statement of Qualifications
- Resumes of Key Personnel
- . List of Municipal References
~, - 2012 Fee Schedule (enclosed herewith under separate sealed cover)
- Sample Municipal Invoice
- Sample Certificates of Insurance, General and Professional Liability
rr
Thank you for the opportunity to submit this proposal. We would be pleased to meet with the Town to
~§ discuss our proposal in more detail.
Yours very truly,
~' ROHDE, SOYKA & ANDREWS
CONSULTING ENGINE RS, P.C.
i
John V. Andrews, Jr., P.E.
~„ Enclosures
~r
ROHDE, SOncA & ANDREWS CONSULTING ENGINEERS, P.C.