Loading...
Weston&Sampson (2) Town of Wappinger, New York Planning Board -Civil Engineering Services COST PROPOSAL Cost Proposal is under separate cover. N:\Marketing\Proposals\2011\Wappingers, Town of -Engineering Services\2 Engineering Fees.doc www.westonandsampson.com WestorN~ampson~ Page 29 ~` RICHARD J. MESSER, P.E. i Background Principal-in-Charge t 2004-Present Regional Manager Weston & Sampson, LA LS PC PE , , , 2000-Present Associate Weston & Sampson EXPERIENCE 1997-2000 Project Manager/Team Leader r. Messer is a professional engineer with over 25 years of project management ~' weston & sampson ~ experience. He currently serves as the regional manager of the firm's business operations in New York. Mr. Messer's diverse project management experi- 1995-1997 ence has involved the evaluation, design, permitting, and site development of waste Site Manager management facilities. His experiences have included numerous site development Waste Management of New Hampshire, Inc. projects involving wastewater gravity lines, force mains, pump stations, storage tanks, telemetry systems, pump controls, and water supply piping. 1991-1995 Senior Environmental Engineer Waste Management of SPECIFIC PROJECT EXPERIENCE New Hampshire, Inc. Principal-in-Charge for our work as Village Engineer for the Village of Tuxedo Park. In 1983-1991 this capacity, Weston 8r Sampson provides a variety of services for the Village, includ- b ^IiY Senior Engineer ing consulting to the Mayor, Board of Trustees, Infrastructure Management Commit- Wehran Engineering tee, Planning Board and Board of Architectural Review, and engineering review of all corporation proposed construction projects within the Village. Education Principal-in-Charge and Project Manager for the development of a Master Plan and lsss construction documentation for the Town of Red Hook, NY's Park Extension Project. Master of Business Administration Design elements include baseball and multi-purpose fields, concessions, restrooms/ University of New Hampshire septic system, multi-use pavilion, picnic areas, playgrounds, improved vehicular access, improved pedestrian/bicycle access, parking, lighting, drinking fountains, hydrants, 1se3 maintenance facility and storage facilities. Bachelor of Science Civil Engineering University of Connecticut principal-in-Charge for the the Rockland County Sewer District No. 1 Smoke Testing Program. This county wide infiltration and inflow source detection program assessed 1s7s over 3 million linear feet of sanitary sewer main over the course of three years. Re- Bachelor of Science sponsibilities included project oversight regarding administration and quality control, Natural Resources staffing of multiple field crews, data management, budget and contract negotiations. Conservation/Biology University of Connecticut Principal-in-Charge for Town of New Castle, NY engineering assignments. Projects ,,, Professional Registration include: Professional Engineer: • Design of a new 16-inch ductile iron water piping system to upgrade an existing Connecticut, Massachusetts, 10-inch ductile iron water line. New Jersey, New York • Demolition of the Campfire Road Pump Station. This project included site evaluation, New Hampshire Level IV Solid Waste preparation of demolition plans and specifications, and oversight of the demolition Facility Mgr/Operator of the pump station. The work was complicated by several factors, including the presence of hazardous materials, adjacent wetlands, and site access limitations. Site OSHA 40-Hour Trained assessments revealed that traces of lead, mercury, and asbestos containing materi- als were present. The presence of PCBs and other contaminants were anticipated. OSHA 10-Hour Construction • Design of a secondary containment system at a water treatment facility. Professional Societies Solid Waste Association of North America ~t J/Resumes/MESSER/municipal 8.11 Weston~ampsol/ Back;a7-ound 2007-Present Team Leader , Weston & Sampson Zoos-zoo? Senior Project Manager Weston & Sampson Zsss-loos Associate Malcolm Pirnie, Inc. Yw Education Zsss Master of Science, Environmental Civil Engineering Cornell University Zss7 Bachelor of Science Civil Engineering Clarkson University Professional Re;;~istration Professional Engineer: New York,Virginia Board Certified Environmental Engineer CARL W. STONE, P.E., BCEE Senior Project Manager -Wastewater EXPERIENCE r. Stone is a Board Certified Environmental Engineer (BCEE) with more than 20 years of experience in water and wastewater project planning and engineering. Mr. Stone is well versed in the coordination and management of large multidisciplinary projects such as the design of $10 million in upgrades to the Heritage Village Wastewater Treatment Plant in Southbury, CT and field coordination/management/ design investigations for the worlds deepest ocean outfall in Ponce, Puerto Rico. Mr. Stone is also a member of the Town of Carmel Environmental Conservation Board, responsible for project review for compliance with Town Code relative to wetlands protection including such things as proposed construction phase and post construction stormwater management practices. A more detailed summary of Mr. Stone's project experience follows: VILLAGE OF TUXEDO PARK, NY Under an on-call engineering contract, Mr. Stone reviews all projects for adequacy of sewer and water infrastructure as well as for compliance of stormwater management practices with the NYSDEC Stormwater Management Design Manual. Mr. Stone also provided coordination assistance for development of the Village Wide Sewer and Water System GIS database and implementation of the New York State DEC Regions 3 mandated Sewer System Evaluation Survey program. ROCKLAND COUNTY SEWER DISTRICT # 1, NY Professional Societies Project Manager for three year countywide infiltration/inflow source detection National Society of Professional smoke testing program of over 3 million linear feet of sewer. Responsible for project Engineers administration, staffing and coordination of multiple field crews, data management, New York Water Environment project budgeting and contract negotiations. Association Virginia Water Environment NEWTOWN CREEK WWTP PROCESS UPGRADES, NY Association Water Environment Federation American Academy of Lead Process Design Engineer for the upgrade of the existing secondary treatment Environmental Engineers system at NYCDEP's Newtown Creek 310 MGD WWTP design flow facility. Performed comprehensive process modeling of the secondary treatment system step feed scenarios to assess process design requirements and develop wet weather operating strategies. NYCDEP WATERSHED PROTECTION PROGRAM - WWTP UPGRADES CATSKILL REGION, NY Led a six month pilot study of biological/chemical addition processes for nutrient removal to evaluate process design requirements for four small wastewater treatment facilities in the NY Catskill Region as part of the NYCDEP's total watershed protection program. Responsible for day to day coordination of field and office activities including pilot system design, setup, operation, data tracking and evaluation, and process design. TOWN OF GREENWICH, CT s' Mr. Stone provides assistance to the DPW's Sewer Division with the coordination and implementation of the Town's multimillion dollar Capital Improvements Program projects. Responsibilities include design review, construction coordination, progress tracking/review and field inspection. Also, oversight of the residential inflow removal program,obtaining necessary permits and implementing inflow removal strategies to remove stormwater from the sewer system. T/Resumes/WSE Stone/wastewater 08.]1 Westo~ampsoa Backe round r~ 2010-Present Senior Landscape Architect/ Team Leader Fraser PE, LS, LA (a Weston & Sampson Company) 1992-2010 Vice President Landscape Architecture and Planning J. Kenneth Fraser and Associates a< Education 1966 Bachelor of Landscape Architecture Syracuse University State University College of Forestry Professional Registration Registered Landscape Architect: New York Massachusetts Delaware Professional Societies ROGER H. MURMAN, RLA Senior Project Manager -Landscape Architecture EXPERIENCE ASenior Landscape Architect, Mr. Murman has over 44 years of experience in both private and public sector landscape architecture and planning, with expertise in site selection and feasibility studies, site master planning, municipal planning, site design and construction period services, approvals processing, state environmental quality review requirements, visual impact statements, and Geographic Information Systems. Throughout his career, he has focused his comprehensive personal service on accommodating user needs within environmental, regulatory, and budget restraints. Mr. Murman has held various positions in private-sector firms, and functioned as owner of his own firm for seven years. Having merged his practice with J. Kenneth Fraser and Associates, PE, LS, LA, P.C. in 1992, he continues to manage landscape architectural and planning projects within the context of a full- service professional corporation, which also practices civil/sanitary engineering, environmental consulting, and land surveying. Mr. Murman has consistently applied creative and technical skills with scientific, cultural, and political understanding to commissions performed directly for project sponsors as a member of a team of consultants and for regulatory agencies. Since 1985, he has been responsible for planning, design and/or construction of approximately $400 million of capital value. American Society of Landscape SEQR COMPLIANCE CONSULTATION FOR LEAD AGENCIES Architects American Planning Association Capital District Planners Association • Belleayre Resort at Catskill Park, Middletown and Shandaken, New York • Visual Impact Analysis, deLaet's Landing, Rensselaer, New York • Student Village Housing, University at Albany, Albany, New York • Grounds Maintenance Facility Relocation, University at Albany, Albany, New York • Stoneridge at Scotia, Scotia, New York it SEQR COMPLIANCE FOR PROJECT SPONSORS • University at Albany East Campus, East Greenbush, New York i Biotechnology and Interdisciplinary Studies Building and Related South Campus Development, Rensselaer Polytechnic Institute, Troy, New York • Kalkberg Commerce Park, Coxsackie and New Baltimore, New York • Montgomery County Public Safety Facility, Glen, New York • Rensselaer Technology Park (RTP), North Greenbush, New York • Chip Fabs at RTP, North Greenbush, New York • Local Waterfront Revitalization Program, East Greenbush, New York • Pond Hill Subdivision, North Greenbush, New York • YWCA Expansion, Schenectady, New York • Amtrak Station Area Development, Rensselaer, New York ADDITIONAL PROJECTS • Managed site and subdivision plan review for seven municipalities or agencies. • Managed 29 municipal strategic or comprehensive planning projects for 17 mu- nicipalities. • Managed 18 municipal park projects planning through implementation for 13 mu- nicipalities. • Managed eight public waterfront projects for six municipalities or agencies. Managed five public trail projects for three municipalities. ~ Managed planning, design, and implementation of expansions and new construc- tion at 16 K-12 school campuse and 13 higher education campuses. ~ Designed site elements for projects ranging from correctional facilities to industrial, commercial, and residential developments. T/Resumes/Murman/WSE municipal 08.11 Westo~ampson Background 2011-Present Team Leader ~ Fraser PE, LS, LA (a Weston & Sampson company) 2o1o-zo11 € Project Manager , Fraser PE, LS, LA rl (a Weston & Sampson company) Director of Engineering #, J. Kenneth Fraser and Associates Education 1992 Bachelor of Science Civil Engineering University of New Hampshire €- i~r Professional Registration Professional Engineer: New York New Hampshire Maine Membershilis REUBEN F. HULL, P.E. Senior Engineer -Site /Civil Engineering EXPERIENCE Mr. Hull has over 22 years of widely diversified engineering experience including site design, stormwater management and flood studies, wastewater collection and treatment, municipal water systems, solid waste site design, structural engineering and dam safety analysis, construction engineering services, as well as community and regional planning. Mr. Hull's skill at public presentation combined with his exceptional expertise in project management has been the key to success for many high profile projects. SPECIFIC PROJECT EXPERIENCE Municipal Site Plan Review • de Laet's Landing Phase 1, Rensselaer, NY • Newfields, New Hampshire -Planning Board consultant • Wakefield Planning Board, Wakefield, New Hampshire -Engineering Review con- sultant • Newton Planning Board, Newton New Hampshire -Planning consultant • Rollinsford Planning Board, Rollinsford, New Hampshire -Engineering Review consultant • Milton Planning Board, Milton, New Hampshire -Engineering Review Consul- tant American Society of Civil Engineers LEED Site Design American Planning Association • Silk Farm Road Audabon Center, Concord, New Hampshire -Gold certified (~, TEC-SMART, Malta, NY -Gold pending • Starfire Building, Malta, NY -certification pending Streetscapes • Historic Downtown Restoration, Exeter, NH (Planning and preliminary design of historic streetscape improvements for 8 blocks) • East Derry Road/Derry Traffic Circle, Derry, NH (Project Manager/design engineer for roadway modifications to accommodate pe- destrian/bike path construction) Pedestrian Facilities ~ Pedestrian and Bicycle Pathway Master Plan -Downtown Loop, Derry, New Hamp- shire (Project Manager for 2-1/2 miles of bicycle and pedestrian pathway throughout Town of Derry, New Hampshire) • Manchester Riverwalk Master Plan -Manchester, New Hampshire (Site planning and design for 2 mile pedestrian bike riverfront trail) Drainage Design • Town-wide Drainage Master Plan, Town of Hampton, New Hampshire • 7-street design for subsurface storage and infiltration systems, Town of Hampton, New York • Historic Odd Fellows Building renovation expansion, Deerfield, New Hampshire • Encore Shoe Building Rehabilitation, Rochester, New Hampshire Sanitary Sewerage • Gunstock Interceptor, Gilford, New Hampshire • City of Rochester Piscataqua Force Main Study, Rochester, New Hampshire • Sewerage Feasibility Study, Town of North Hampton, New Hampshire • Sewer Extension Study, Town of Merrick, New Hampshire Weston~ampson T/Resumes/Ftaset/Hull WSE LEED municipal 8.11