Loading...
2011-1882011-188 Resolution Authorizing the Collection of Bids and Replacement of Appliances Within the Town Hall Public Restrooms At a regular meeting of the Town Board of the Town of Wappinger, Dutchess County, New York, held at Town Hall, 20 Middlebush Road, Wappingers Falls, New York, on May 23, 2011. The meeting was called to order by Christopher Colsey, Supervisor, and upon roll being called, the following were present: PRESENT: Supervisor Councilmembers ABSENT: Christopher J. Colsey William H. Beale Vincent F. Bettina Ismay Czarniecki Joseph P. Paoloni (arrived at 6:30 PM) The following Resolution was introduced by Supervisor Colsey and seconded by Councilman Beale. WHEREAS, the Supervisor of Buildings and Grounds has recommended the replacement of the sink and counter units in the men's and women's public restroom with stainless steel units in a memo dated April 13, 2011, as distributed to the Town Board; and WHEREAS, the estimated cost to replace both complete units is Two Thousand, Nine Hundred Eighty -Three Dollars and 79/100 ($2,983.79); and WHEREAS, the Town of Wappinger Town Code §46 outlines the requirement for quotations and competitive bidding; and WHEREAS, the Town Board hereby authorizes the Supervisor of Buildings and Grounds to gain quotations and/or bids in accordance with the Town of Wappinger Town Code §46 to purchase replacement stainless steel sink and counter units from Budget Line A1620.450 (Town Hall/Emergency Service Building Repairs). NOW, THEREFORE, BE IT RESOLVED, as follows: 1. The recitations above set forth are incorporated in this Resolution as if fully set forth and adopted herein. 2. The Town Board hereby authorizes the Supervisor of Buildings and Grounds to gain quotations and/or bids in accordance with the Town of Wappinger Town Code §46 to purchase replacement stainless steel sink and counter units from Budget Line A1620.450 (Town Hall/Emergency Service Building Repairs). The foregoing was put to a vote which resulted as follows: CHRISTOPHER COLSEY, SUPERVISOR Voting: AYE WILLIAM H. BEALE, COUNCILMAN Voting: AYE VINCENT F. BETTINA, COUNCILMAN Voting: AYE ISMAY CZARNIECKI, COUNCILWOMAN Voting: AYE JOSEPH P. PAOLONI, COUNCILMAN Voting: AYE Dated: Wappingers Falls, New York 5/23/2011 The Resolution is hereby duly declared adopted. a ulk� Ybp C. MASTERSON, TOWN CLERK RECREATION CHAIRMAN Ralph J. Holt 20 MIDDLEBUSH ROAD WAPPINGERS FALLS, NY 12590 (845) 297-4158 - Main (845) 297-0720 - Direct (845) 297-8451— Fax www. townofwappinger.us April 13, 2011 MEMO TO: SUBJECT FROM: TOWN OF WAPPINGER Recreation Department MEMO CHRISTOPHER COLSEY, SUPERVISOR ..jill!7I 111 0!!l STEVE FRAZIER TOWN SUPERVISOR Christopher J. Colsey TOWN BOARD William H. Beale Vincent Bettina Ismay Czarniecki Joseph P. Paoloni Supervisor Office APR 13 2011 Received I had contacted Tan (pronounced yaan) at Metconix Inc. to give a quotation to replace the sink vanity and fixtures in the public restrooms at Town Hall with seamless stainless steel units of similar dimensions to the existing units. The current units are deteriorating from water damage and it is my feeling that any replacement made of similar material will deteriorate in the same manner over time. The stainless steel units will be a permanent replacement which will be easier to maintain and less susceptible to damage than other materials. Attached you will find their quote of $2983.79. This is a highly specialized type of work and it will most likely be difficult to obtain additional bids. Steve Frazier Supervisor, Buildings & Grounds Apr -'-13 11 12:13p METCONIX metconix inc 9 Hanna Lane Beacon, NY 1204 8455921863 Estimate C:Ee Estimate # 4;1/2011 1416 Name/ Address Wappingers Town Hall 20 Middle Bush Rd Wappingers Falls, NY 12590 P.O. No. Due Date Project 4111201 I Item Description Qty Cost Total NSFab Fabrication of men's room stainless steel countertop 1,36337 1,303.37 measuring 66-114" x 22" with two intcerated stainless steel sinks and 4" backsplash along one 22" side and the hack 66-1/4" side NSFab Fabrication of women's room stainless steel countertop 1,620.42 1,620.42 measuring 78" x 23" with two integrated stainless steel sinks and 4" backs -plash along one 23" side and the back 78" side. Additional strut support tied back to wall. Price includes all sinks and holes drilled for plumbing, as well as installation. Countertops back by marine plywood and painted. Customer is responsible for all legal and collection fees. Sales Tax {8.125°lo) �� ��� Price valid for 30 days from date of estimate Total 52,983.79 945.592.1863 w�wur.metconix.com Customer Signature